Request No. - CAR00024
Contractor Assessment Request Details
Assessment Type New
Vendor
Contractor MRS ENGINEERING
Contractor Location PANTNAGAR
Contractor Email ID MRS ENGINEERING
Plant Code 1126
 
Preliminary Details For Evaluation
Contractor Type Civil Fabrication
Name of Company / Contractor M.R.S ENGG. WORKS
Contact Person Name RAVI KUMAR
Contact Number 9599649948
Work Description MANUF. & SUPPL. STEEL TELESCOPIC COVER, NYLON BELLOW COVER, CHIPS CONVEYOR, WIPERS, APRON, ROLLWAY COVERS, CABLE DRAG CHAIN, MAGNETIC DUST SEPARATOR ELECTRIC, CNC PANEL,CNC BODY COVER & GENERAL ORDER SUPPLIER ETC.
Previous ETL Contracts NA
Existing Clientele NA
Organizational Chart 24_OrganizationalChart_.pdf
Employees Head Count 8
Employees Deployed Count at ETL 0
Supervisors Count 1
Is Sub Contractor Nominated ? No
Sub Contractor
Contractors Financial Health & Capability (Turnover in INR) 1270605
C A Certificate 24_CACertificate_.pdf
Does your last two years balance sheet shows profit? No
Balance Sheet
Do you have at least 3 years of experience for carrying out similar activity? No
Experience Certificate
 
Section 1 - Mandatory Requirement
Sr.No Requirement Text Options License / Registration No. / Policy No. Attachment Valid Till Score
1Is the organization registered for EPF?Not Applicable5
2License under the Factory Act.1948 / Contract Labor Act / Shop ActNot Applicable5
3Number of employees authorized to deploy as per licenseNot Applicable5
4Workmen compensation Policy / Group InsuranceComplied6100056020000109924_16__section1_.pdf27.08.20225
5Are workers working hours complied with the current applicable law in the country?Not Applicable5
6Are wages paid on the basis of Minimum Wages Act?Not Applicable5
7Is the organization registered for ESIC?Complied6100056020000109924_14__section1_.pdf27.08.20225
8Is the organization registered for GSTN?Complied05BBYPR4363P1ZK24_15__section1_.pdf27.08.20225
9Licensed Electrical Supervisor / Electrician If Applicable (For Electrical Work)Not Applicable5
10Any complaint registered against the contractor in past under Labour lawsNot Applicable5
 
Total - 50
 
Section 2 - Safety Performance
Sr.No Requirement Text Answer Details Attachment Score
1No. of Accidents (Medical Treatment) in last 2 years05
2No. of Fatalities (Verify from Govt. data / reference check)05
3No. of Lost time injuries as per Factories Act 1948 (Injured person not able to work more than 48 hours from time of accident)05
4No. of Fire Incident in last 2 years05
5Has the organisation been prosecuted for an HSE breach or injury to an employee? Specify nos.05
 
Total - 25
 
Section 3 - General EHS Systems
Sr.No Requirement Text Answer Details Attachment Score
1HSE Policy (Provide evidence by supplying copies of relevant documents)Not Applicable5
2Induction and Training (provide relevant documents)Not Applicable5
3PPE’s maintained in Good ConditionNot Applicable5
4Health monitoring of Employees - Medical Check Up Done for employee’s as per Form 7 (date / Fitness Certificate from AFIH doctor)Not Applicable5
5Does the organization regularly inspect and maintain hand tools, machinery (cranes, vehicles, hoists/lifting tools, etc.)Not Applicable5
 
Total - 25
 
Section 4 - EHS Practices
Sr.No Requirement Text Answer Details Attachment Score
1Is the contract employee aware of Work Permit System / Work Permit Adherence?Not Applicable5
2Is the organization aware of Method Statement/ Method Statement Adherence?Not Applicable5
3Are the contract employees aware of Emergency Response Procedure?Not Applicable5
4Has the organization conducted a HIRA study in past / or as a part of current practice?Not Applicable5
5Does the organization have and follow safe work procedures, documents which define how risks relevant to the contracted activities are managed?Not Applicable5
 
Total - 25
 
Section 5 - Plant and Equipment
Sr.No Requirement Text Answer Details Attachment Score
1Are the tools and equipment used in good working condition?Yes5
2Do the tools and equipment comply with standards such as ISI Mark / Energy Efficient 5 star rating guidelines?Yes5
3Is the holding handle of equipment in good condition?Yes5
4Are all plants and equipment compliant with the safety requirements? (including not damaged cables, no loose connections, equipped with 3 pin top)Yes5
5Do contract employees have correct licenses / certificates to operate the plants and equipment?Not Applicable5
 
Total - 25
 
Total Score
Section Score
Section 1
Mandetory Requirement
50
Section 2
Safety Performance & System Awareness
25
Section 3
General EHS Systems
25
Section 4
EHS Practices
25
Section 5
Plant and Equipment
25
Total Score
150
 
The overall ranking of pre-qualification is 100 % (Professional)
 
 
Approval Process History
Role Employee Request Status Comments Updated On