QFR No - 7000825096
Defect Details
NC No. | 7000825096 |
NC Date | 15/03/2022 |
NC Submission Date | |
Part No. | C2CH00302B |
Part Name | JUDDER SPRING_C20009_D1 |
Supplier Name & Code | 100160-PIANO PRESITEL. |
ETL Plant | 1132-ETL K-226/1 TRANSMISSION |
Defect Details | FLATNESS NOT OK.-Gap gauge 3.02 not qualify,flatness 0.60 |
1. Problem Description
Defect Description | Parts not qualifying to Gap gauge 3.02 & flatness observed upto 0.6 mm |
Detection Stage | Receipt |
Problem Severity | Function |
NG Quantity | 271 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | |
Plant Head/CEO Email ID | |
MD Email ID |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
--
|
--
|
--
|
--
|
--
|
--
|
Check Qty |
--
|
--
|
--
|
--
|
--
|
--
|
NG Qty |
--
|
--
|
--
|
--
|
--
|
--
|
Scrap | |
Rework | |
Under Deviation |
Containment Action |
---|
-- |
3. Process Flow
Process Flow Description |
---|
-- |
4. Process Details
Process / Operation | |
Outsource | |
Machine / Cell | |
Machine / Cell No. |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|
6. Inspection Method Analysis (Current)
Inspection Method | |
Other Inspection Method | |
Check Point at Final Inspection | |
Checking Freq. | |
Sampling | |
Sample Size |
7. Root Cause Analysis (Occurance)
Why 1 | |
Why 2 | |
Why 3 | |
Why 4 | |
Why 5 | |
Root Cause (Occurance) |
Root Cause Analysis (Outflow)
Why 1 | |
Why 2 | |
Why 3 | |
Why 4 | |
Why 5 | |
Root Cause (Outflow) |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|
9. Inspection Method After Customer Complaint
Change In Inspection System | |
Change Details | |
Inspection Method | |
Other Inspection Method | |
Check Point at Final Inspection | |
Checking Freq. | |
Sampling | |
Sample Size |
10. Evidance of Countermeasure
Occurance (Before) |
|
Occurance (After) |
|
Outflow (Before) |
|
Outflow (After) |
|
11. Horizontal Deployment
Horizontal Deployment Required | |
Applicable Machine / Model / Plant |
12. Document Review
Documents | |
Specify Other Document |
13. Effectiveness Of Action
Reviewed Quantity | |
Reason for submission |