QFR No - 7000827149
Defect Details
NC No. | 7000827149 |
NC Date | 23/03/2022 |
NC Submission Date | |
Part No. | 533KU00102 |
Part Name | ROD GUIDE |
Supplier Name & Code | 204749-GKN SINTER METALS PRIVATE LIMI |
ETL Plant | 1126-ETL Pantnagar |
Defect Details | NOT AS PER SPECIFICATION-Chamfer profile not OK |
1. Problem Description
Defect Description | Chamfer profile not OK - Step observed at chamfer of Rod guide (533KU00102) |
Detection Stage | Inprocess |
Problem Severity | Fitment |
NG Quantity | 5000 |
Is Defect Repeatative? | No |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | Bhaskar.Dhalawade@gknpm.com |
Plant Head/CEO Email ID | Purushottam.Rishi@gknpm.com |
MD Email ID | Rajesh.Mirani@gknpm.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
5000
|
25000
|
0
|
0
|
0
|
30000
|
Check Qty |
5000
|
25000
|
0
|
0
|
0
|
30000
|
NG Qty |
5000
|
25000
|
0
|
0
|
0
|
30000
|
Scrap | 0 |
Rework | 30000 |
Under Deviation | 0 |
Containment Action |
---|
Part can not be reworked at WH or Customer end , all parts ( 30K) called back for rework at GKN end |
3. Process Flow
Process Flow Description |
---|
Mixing > Forming > sintering > Barreling > Chamfering > Sizing > 100% inspection > oil dipping > Final inspection > dispatch |
4. Process Details
Process / Operation | Sizing |
Outsource | No |
Machine / Cell | K40 |
Machine / Cell No. | Szing_ K40 Cell |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Machine | Tool alignment issues | Sizing die, top punch, bottom punch, core rod clearance checked and found within 0.020mm ( OK) | X |
Machine | Free flow of material at inclind chamfer face during sizing process | Chamfer profile check by contour graph tracing ; curvature observed on chamfer face | O |
Method | Chamfer profile not checked in sizing | Vrified control plan for chamfer angle check ; chamfer angle is checked in chamfering process howeve | O |
Man | Unskilled operator | Skill matrix verified ; found OK | X |
Machine | Chamfering tool worn out | Chanfering core rod inspected and found OK | X |
6. Inspection Method Analysis (Current)
Inspection Method | Instrument |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | 2 |
7. Root Cause Analysis (Occurance)
Why 1 | Curvature shape profile of C`bore chamfer causes sharp edge at the end of chamfer |
Why 2 | Free flow of material at incline chamfer face during sizing process |
Why 3 | Chamfer area not supported by tool at incline portion in sizing process |
Why 4 | Degree not provided on sizing tool while sizing |
Why 5 | |
Root Cause (Occurance) | Degree not provided on sizing tool while sizing |
Root Cause Analysis (Outflow)
Why 1 | Abnormal profile of core rod could not get detected during sizing inspection |
Why 2 | Abnormal chamfer in sizing process not detected by inspector |
Why 3 | Chamfer not checked by inspector in sizing process |
Why 4 | Chamfer check not mentioned in sizing QC ( Only checked in chamfering process) |
Why 5 | |
Root Cause (Outflow) | Chamfer check not mentioned in sizing QC ( Only checked in chamfering process) |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Outflow | . Control plan to be updated for adding chamfer inspection during sizing operation | Ajay Shinde | 08/04/2022 | Completed | |
Occurance | 2. Core rod design to be modified : chamfer profile to given on core rod instead of using plain core rod. | Ajay Shinde | 08/04/2022 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | chamfer degree inspection during sizing operation |
Inspection Method | Instrument |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | 2 / batch |
10. Evidance of Countermeasure
Occurance (Before) |
|
Occurance (After) |
|
Outflow (Before) |
|
Outflow (After) |
|
11. Horizontal Deployment
Horizontal Deployment Required | |
Applicable Machine / Model / Plant |
12. Document Review
Documents | |
Specify Other Document |
13. Effectiveness Of Action
Reviewed Quantity | |
Reason for submission |