QFR No - 7000834887
Defect Details
NC No. 7000834887
NC Date 06/05/2022
NC Submission Date
Part No. 520JT00102
Part Name PLATE CLUTCH K-70
Supplier Name & Code 100299-CITIZEN EXPORTS
ETL Plant 1135-ETL 7/10 P Nagar
Defect Details OXDISED-
 
1. Problem Description
Defect Description visual defects- rust on plate
Detection Stage Receipt
Problem Severity Aesthetic
NG Quantity 512
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID qualitypantnagar@citizencomponents.com
Plant Head/CEO Email ID citizenexports@citizencomponents.com
MD Email ID ceo@citizencomponents.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
1440
0
0
1259
594
3293
Check Qty
1440
0
0
1259
594
3293
NG Qty
39
0
0
9
0
48
 
Scrap 0
Rework 48
Under Deviation 0
Containment Action
100% Part checked at customer end & Citizen end FG with WIP Stage and after inspection defective part resting in Red Bin
 
3. Process Flow
Process Flow Description
RM & Blanking
 
4. Process Details
Process / Operation Blanking
Outsource No
Machine / Cell Power Press Machine
Machine / Cell No. Power Press Machine
5. Problem Analysis
Type Possible Cause Fact Verification Jud
ToolTooling ok as per requiredTooling is ok as per requiredO
MethodAfter Planishingdept material has been cleanAfter Planishing dept material has been clean done at Citizen EndO
MaterialMaterial Grade or Thickness and visual as per required okMaterial Grade or Thickness as per required ok but RM observation rusted typeX
ManTrained OpreatorOperator aware about the Material SpecificationO
MachineMachine CapacityMachine Capacity is okO
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size Per/Lot
7. Root Cause Analysis (Occurance)
Why 1 Clutch Plate Rusted Observation at ETL end
Why 2 RM rusted observation at Storage area
Why 3 Due to RM inventory carry out 3 to 4 Month at Citizen End
Why 4 Due to RM MOQ define approx 20Ton with RM Supplier .
Why 5
Root Cause (Occurance) Due to RM MOQ define approx 20Ton with RM Supplier .
 
Root Cause Analysis (Outflow)
Why 1 Defective Part Not arrested during inspection
Why 2 Rusted Part After cleaning not checked
Why 3
Why 4
Why 5
Root Cause (Outflow) NG part not found during final quality gate.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
Occurance1- Clutch Plate Blank Grinding process after 100% Clutch Plate clean with Anti Rust chemical for avoiding rust issue at customer end 2- Clutch Plate Thickness Minimum 1.58 deviation received from ETL Side avoid to defined Supplier MOQ and other issueMr. Yogesh Kumar & Mr. Vineet Kumar02/06/202202/06/2022Completed
Outflow1- 100% Part will cheeked after blanking and also 100% part checked at Quality Gate before dispatchMr. Yogesh Kumar & Mr. Vineet Kumar02/06/202202/06/2022Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details 100% Part will checked after blanking and also 100% part checked by Visual Method at quality gate before dispatch .
Inspection Method Other
Other Inspection Method Visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size P/L
10. Evidance of Countermeasure
Occurance (Before) Rusted Part cleaning have not done with anti rust chemical
91_Occurance_Before.pdf
Occurance (After) 1- Rusted part Cleaning have started with Anti rust chemical and after cleaning rust prevent oil used on part avoiding rust issue. 2- Clutch Plate thickness 1.58mm deviation received against to minimum 1.60mm from ETL Side for avoiding to rust and other issues due to supplier defined MOQ 20T
91_Occurance_After.pdf
Outflow (Before) Part checked only final stage
91_Outflow_Before.pdf
Outflow (After) After Cleaning part have checked 100% before Planishing process and 2nd visual inspection have done at Final Stage
91_Outflow_After.pdf
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant Power Machine
 
12. Document Review
Documents ProcessFlowChart, InspCheckSheet
Specify Other Document NA
 
13. Effectiveness Of Action
Reviewed Quantity 50
Reason for submission ok