QFR No - 7000867314
Defect Details
NC No. 7000867314
NC Date 30/09/2022
NC Submission Date
Part No. 520BI00961
Part Name CALIPER BODY LH FINISHED -JD BLACK
Supplier Name & Code 201092-PRANEEL INDUSTRIES
ETL Plant 1120-ETL K-226/2 Disc Brakes
Defect Details FITTMENT NOT OK.-Burr fold inside the 10 mm hole
 
1. Problem Description
Defect Description Burr fold inside the 10 mm hole
Detection Stage Receipt
Problem Severity Fitment
NG Quantity 131
Is Defect Repeatative? No
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID quality@praneelgroup.com
Plant Head/CEO Email ID praneelindustries@rediiffmail.com
MD Email ID anilpatil@praneelgroup.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
1000
0
0
500
1500
3000
Check Qty
1000
0
0
500
1500
3000
NG Qty
131
0
0
0
0
131
 
Scrap 131
Rework 0
Under Deviation 0
Containment Action
100% stock inspected at ETL and supplier end and ok parts to line with identification mark
 
3. Process Flow
Process Flow Description
1.Raw Material inspection 2. Powder Coating Process 3.Inspection of powder coating parts 4. Face milling 5. Drilling & Tapping 6.Deburring 7.Final Inspection 8.PDI 9.Packing & Dispatch
 
4. Process Details
Process / Operation GDC Machine
Outsource Yes
Machine / Cell GDC Machine
Machine / Cell No. GDC Machine 02
5. Problem Analysis
Type Possible Cause Fact Verification Jud
ToolTool Wear outFittment issueX
 
6. Inspection Method Analysis (Current)
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
7. Root Cause Analysis (Occurance)
Why 1 Burr fold inside dia 10 mm
Why 2 Core pin undersized
Why 3 core pin wear out
Why 4 core pin life not monitored
Why 5
Root Cause (Occurance) Due to core pin wear out burr fold in dia 10mm
 
Root Cause Analysis (Outflow)
Why 1 core pin wear out
Why 2 core min life not monitored
Why 3
Why 4
Why 5
Root Cause (Outflow) due to core pin life not monitored core pin wear out leads into burr fold
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceCore pin monitoring staredQA10/10/202210/10/2022Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Core pin inspection frequency change
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
10. Evidance of Countermeasure
Occurance (Before) CD Checking point not added in check sheet
266_Occurance_Before.pptx
Occurance (After) 100% CD Checking added in Check sheet
266_Occurance_After.pptx
Outflow (Before) Core Pin life not monitored
266_Outflow_Before.pptx
Outflow (After) Core pin life monitoring started
266_Outflow_After.pptx
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant GDC machine
 
12. Document Review
Documents PMCheckSheet, InspCheckSheet
Specify Other Document Q alert
 
13. Effectiveness Of Action
Reviewed Quantity 10000
Reason for submission OK.