QFR No - 7000869422
Defect Details
NC No. | 7000869422 |
NC Date | 10/10/2022 |
NC Submission Date | |
Part No. | 520GR00102 |
Part Name | MEMBRANE |
Supplier Name & Code | 203807-ROOP POLYMERS LTD. |
ETL Plant | 1126-ETL Pantnagar |
Defect Details | LEAKAGE-Leakage Due to non-filling |
1. Problem Description
Defect Description | Leakage issue due to Non Filling at O Ring |
Detection Stage | Receipt |
Problem Severity | Function |
NG Quantity | 9000 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo | cwg20gmhnzlfu0ffjmtswljj.jpg |
Supplier Communication Details
Quality Head Email ID | prem.singh@rooppolymers.com |
Plant Head/CEO Email ID | ashish.grover@rooppolymers.com |
MD Email ID | pbs.rawat@rooppolymers.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
2000
|
0
|
0
|
500
|
200
|
2700
|
Check Qty |
2000
|
0
|
0
|
500
|
200
|
2700
|
NG Qty |
12
|
0
|
0
|
5
|
0
|
17
|
Scrap | 10 |
Rework | 7 |
Under Deviation | 0 |
Containment Action |
---|
Verify the available lot @ ETL as well as plant |
3. Process Flow
Process Flow Description |
---|
Rubber Molding. |
4. Process Details
Process / Operation | Molding |
Outsource | No |
Machine / Cell | 08 |
Machine / Cell No. | 1 |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Method | Material Loading Pattern Not Followed. | Found As per PCS. | O |
Man | Less skilled operator | Skilled level 3 operator , as per skill matrix | O |
Machine | Level of Machine Not OK | Level found within 0.025mm against spec 0.5mm | O |
Material | Hardness of Material Excess | Found 55 Shore A | O |
Tool | Leakage From Pocket & Plunger | Gap Observed in Plunger & Pocket. | X |
Man | Less input weight placed by operator | Checked weight & found OK | O |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | Visual |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 100% |
7. Root Cause Analysis (Occurance)
Why 1 | Leakage issue due to Non Filling at O Ring area |
Why 2 | Material Leakage from Transfer Pocket |
Why 3 | Clearance observed in Pocket & Plunger corners. |
Why 4 | |
Why 5 | |
Root Cause (Occurance) | Clearance observed in Pocket & Plunger corners. |
Root Cause Analysis (Outflow)
Why 1 | Non filling @ O- ring Out flowed to customer. |
Why 2 | Defective Part Mix-up with OK Parts |
Why 3 | Small Red Bin Installed @ top of Inspection Table. |
Why 4 | |
Why 5 | |
Root Cause (Outflow) | Small Red Bin Installed @ top of Inspection Table. |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Occurance | Pocket & Plunger welding & matching done to prevent Leakage | Daler Singh | 14/10/2022 | 14/10/2022 | Completed |
Outflow | Training given to concerned Inspector | Rishabh Rastogi | 14/10/2022 | 14/10/2022 | Completed |
Outflow | Red Bin Location Defined inside the Inspection table & Hole Given on top of the table to place the part into red bin. | Rishabh Rastogi | 13/10/2022 | 14/10/2022 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | No |
Change Details | 100% Visual Inspection available. |
Inspection Method | Other |
Other Inspection Method | Visual |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 100% |
10. Evidance of Countermeasure
Occurance (Before) |
Clearance between Plunger & Pocket. 280_Occurance_Before.jpg |
Occurance (After) |
Welding & Matching done on plunger to prevent Leakage 280_Occurance_After.jpg |
Outflow (Before) |
Red Bin is above the table, NG Part Mixed with OK Parts. 280_Outflow_Before.jpg |
Outflow (After) |
Red Bin placed Under rack, Hole Given for Part placing into red bin. 280_Outflow_After.jpg |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | Rubber Moulding |
12. Document Review
Documents | WISOP |
Specify Other Document | Tool History Card |
13. Effectiveness Of Action
Reviewed Quantity | 1 |
Reason for submission | Found OK |