QFR No - 7000869893
Defect Details
NC No. 7000869893
NC Date 11/10/2022
NC Submission Date
Part No. 520FN04002
Part Name HOLDER CLUTCH
Supplier Name & Code 100153-HINDUSTAN PRESSINGS PVT.LTD.
ETL Plant 1135-ETL 7/10 P Nagar
Defect Details DEEP MARK-
 
1. Problem Description
Defect Description Dent issue on ID
Detection Stage Receipt
Problem Severity Fitment
NG Quantity 250
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID quality.p1@hpplindia.com
Plant Head/CEO Email ID spatil@hpplindia.com
MD Email ID rakesh@hpplindia.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
9000
1000
0
0
0
10000
Check Qty
9000
0
0
0
0
9000
NG Qty
3072
0
0
0
0
3072
 
Scrap 0
Rework 3072
Under Deviation 0
Containment Action
Segregation done at ETL pantanagar.
 
3. Process Flow
Process Flow Description
1. Raw material receipt and Inspection , 2. blanking and piercing, 3. sandering , 4. Vibro and Dryer, 5. Four Hole Chamfer, 6. Machining -Outsource, 7. Final Inspection 8. Oiling and packaging, 9. PDIR & Dispatch
 
4. Process Details
Process / Operation Machining and material handling
Outsource Yes
Machine / Cell CNC Lathe
Machine / Cell No. 01
5. Problem Analysis
Type Possible Cause Fact Verification Jud
Materialpoor material finish or pitted material usedHR material is used as specified in drg, small dent mark on HR finish material are acceptable .O
Manpoor material handling during inprocess and inspectionverified that bins are provided at each station and material stacking done neatly.O
Tooldamaged tool usedtool condition was okayO
Machinetool mark during machiningverified, found okayO
MethodPoor material handling during transportation from pune to aurangabad warehouseafter receipt at warehouse parts checked, dent on the parts observed.X
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method visual checking
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size lot size
7. Root Cause Analysis (Occurance)
Why 1 Dent mark on ID, OD & Face.
Why 2 Dent marks are due to metal to metal contact and misshandling.
Why 3 during transit from pune to aurangabad warehouse and loading-unloading these dent issue occured.
Why 4
Why 5
Root Cause (Occurance) Due to poor material handling while transportation and loading -unloading heavy dent observed.
 
Root Cause Analysis (Outflow)
Why 1 Dent mark on ID, OD & Face
Why 2 100% inspection done by final inspector but defect not detected.
Why 3 Less awareness to inspector regarding small dents on face which is not detected visually easily.
Why 4
Why 5
Root Cause (Outflow) Less awareness to inspector regarding small dents which are not detected visually easily.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceAwareness given to the transportor about dent issue due to poor transportation.Mr.Sontakke ( HPPL, Aurangabad) and transportor20/10/202218/10/2022Completed
Occurancetraining given to the personel who are involved in loading and unloading at warehouse and personnel from HPPL PUNEMr. Hitendra Patil(HPPL) and Mr, Sontakke(HPPL)20/10/202218/10/2022Completed
Outflow1. Inspector training regarding all final inspection activities of 4002 holder,specially focussing on smaller dent on face. 2. 100% visual inspection at HPPL pune and 100% visual insection at HPPL aurangabad warehouse by experienced senior QA person for next 3 lotMr.Sontakke ( HPPL, Aurangabad)20/10/202218/10/2022Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System No
Change Details NA
Inspection Method Other
Other Inspection Method Visual checking
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size lot size
10. Evidance of Countermeasure
Occurance (Before) dent mark was observed due to misshandling and metal to metal contact during material transit
282_Occurance_Before.pdf
Occurance (After) Awareness given about dent issue due to poor transportation to the transportor. training on material loading unloading is given at HPPL PUNE and HPPL warehouse aurangabad.
282_Occurance_After.pdf
Outflow (Before) Less awareness to inspector regarding small dents on face which is not detected visually easily.
282_Outflow_Before.pdf
Outflow (After) 1. Inspector training regarding all final inspection activities of 4002 holder,specially focussing on smaller dent on face. 2. 100% visual inspection at HPPL pune and 100% visual insection at HPPL aurangabad warehouse by experienced senior QA person for next 3 lot.
282_Outflow_After.pdf
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant NA
 
12. Document Review
Documents InspCheckSheet
Specify Other Document NA
 
13. Effectiveness Of Action
Reviewed Quantity 50
Reason for submission ok