QFR No - 7000910858
Defect Details
NC No. | 7000910858 |
NC Date | 22/04/2023 |
NC Submission Date | |
Part No. | S2DC03102B |
Part Name | INNER DUST COVER K55G |
Supplier Name & Code | 100990-JAIRAJ ANCILLARIES PVT LTD |
ETL Plant | 1116-ETL K-120 Suspension |
Defect Details | BEND-found bend |
1. Problem Description
Defect Description | During receipt inspection parts observed in bend condition?? Assembly fitment not possible. |
Detection Stage | Receipt |
Problem Severity | Fitment |
NG Quantity | 300 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | planthead.aurangabad@jairajgroup.com |
Plant Head/CEO Email ID | vp@jairajgroup.com |
MD Email ID | rajiv@jairajgroup.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
5600
|
0
|
0
|
3000
|
0
|
8600
|
Check Qty |
5600
|
0
|
0
|
3000
|
0
|
8600
|
NG Qty |
300
|
0
|
0
|
10
|
0
|
310
|
Scrap | 310 |
Rework | 0 |
Under Deviation | 0 |
Containment Action |
---|
1. 100% inspection done at customer end & from all stages. 2. Defective parts are scrapped - 310 no`s - 27.04.2023 |
3. Process Flow
Process Flow Description |
---|
RM Receiving- Inward Inspection- RM Issue- Master batch mixing - Injection molding -Deflashing - Final Inspection - Packing & Labelling - PDI & Dispatch |
4. Process Details
Process / Operation | Injection Molding |
Outsource | No |
Machine / Cell | IMM |
Machine / Cell No. | IMM-07 |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Method | Process parameter sheet not followed as per CP | Verified PPS . Found ok as per control plan | O |
Tool | Tool PM not done | Verified & found ok | O |
Material | RM Grade is not as per specification | Verified RMTC - Found ok - PPCP | O |
Method | Stacking method In-adequately followed | Verified stacking height for IDC 3102 . Observed that 2 bags are more than specified stacking height | X |
Machine | Injection pressure high/low comparing as per PPS | Verified injection pressure & found ok as per PPS | O |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | Visual |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | - |
7. Root Cause Analysis (Occurance)
Why 1 | Part found bend due to stacking height weight |
Why 2 | Stacking height is more than defined |
Why 3 | In-adequate awareness about the stacking height resulting into bend |
Why 4 | |
Why 5 | |
Root Cause (Occurance) | In-adequate awareness about the stacking height resulting into bend |
Root Cause Analysis (Outflow)
Why 1 | Bend part not detected during PDI |
Why 2 | Unable to detect the defect as PDI done on sampling basis only |
Why 3 | |
Why 4 | |
Why 5 | |
Root Cause (Outflow) | Unable to detect the defect as PDI done on sampling basis only |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Outflow | To check each & every bag on sampling basis during PDI | Amol Jagtap | 05/05/2023 | Completed | |
Occurance | Awareness training about stacking height | Sachin Kulkarni | 05/05/2023 | Completed | |
Outflow | OPL & Q alert to be displayed | Sachin Kulkarni | 05/05/2023 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | Check each & every bag on sampling basis during PDI |
Inspection Method | Other |
Other Inspection Method | Visual |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | - |
10. Evidance of Countermeasure
Occurance (Before) |
In-adequate Stacking height 431_Occurance_Before.jpg |
Occurance (After) |
Proper stacking height 431_Occurance_After.jpg |
Outflow (Before) |
PDI on sampling plan 431_Outflow_Before.pdf |
Outflow (After) |
Each & every bag checked on sampling basis during PDI 431_Outflow_After.pdf |
11. Horizontal Deployment
Horizontal Deployment Required | No |
Applicable Machine / Model / Plant | - |
12. Document Review
Documents | WISOP, InspCheckSheet |
Specify Other Document | - |
13. Effectiveness Of Action
Reviewed Quantity | 10 |
Reason for submission | Corrective action parts submission. |