QFR No - 7000911552
Defect Details
NC No. 7000911552
NC Date 26/04/2023
NC Submission Date
Part No. S2AB01907B
Part Name ADJUSTER POWDER COATED
Supplier Name & Code 100973-TESMO MOTORCAST PRIVATE LIMITE
ETL Plant 1116-ETL K-120 Suspension
Defect Details EXCESS MATERIAL-excess material at spring resting face
 
1. Problem Description
Defect Description Major power coating defects observed with casting concern also.
Detection Stage Receipt
Problem Severity Aesthetic
NG Quantity 1200
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID rkhare@tesmomotorcast.com
Plant Head/CEO Email ID harish.bala@tesmomotorcast.com
MD Email ID svkallani@tesmomotorcast.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
3200
0
4200
3000
6000
16400
Check Qty
3200
0
0
3000
6000
12200
NG Qty
1200
0
0
0
0
1200
 
Scrap 1200
Rework 0
Under Deviation 0
Containment Action
Check point added in final stage.
 
3. Process Flow
Process Flow Description
PDC-REAMER-GRINDING-SURFACE TREATMENT-INSPECTION-POWDER COATING-SAMPLE INSPECTION-PACKING DESPATCH
 
4. Process Details
Process / Operation PDC
Outsource No
Machine / Cell PDC-350 Ton
Machine / Cell No. PDC-5
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MethodEjector Pin dia oversizepin bend dia oversize & excess Flash generatedO
Toolpin jam in diepin dia oversize due to heat generationO
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method visual checking
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 1
7. Root Cause Analysis (Occurance)
Why 1 PIN FLASH ON SPRING RESTING FACE
Why 2 EJECTOR PIN DIE INCREASE ON INSERT
Why 3 DIE RUNNING WITH UNBALANCE EJECTION
Why 4 SETTING NOT DONE CORRECTLY
Why 5 POOR SKILL LEVEL
Root Cause (Occurance) EJECTOR SETTING SKILL LEVEL NOT GOOD
 
Root Cause Analysis (Outflow)
Why 1 PIN FLASH ON SPRING RESTING FACE
Why 2 PIN FLASH CHECKING MISSED BY INSPECTOR
Why 3 IMPROPER TRAINING TO INSPECTOR
Why 4 VISUAL DISPLAY NOT AVAILABLE
Why 5
Root Cause (Outflow) VISUAL DISPLAY OF PIN FLASH NOT AVAILABLE
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OutflowVISUAL DISPLAY AT INSPECTION WITH PROPER TRAININGANKUSH30/06/202330/06/2023Completed
OccurancePIN AND INSERT DIAMETER CHECKINGSACHIN01/07/202301/07/2023Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details VISUAL DISPLAY IN INSPECTION TABLE WITH SAMPLES
Inspection Method Other
Other Inspection Method VISUAL
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 1
10. Evidance of Countermeasure
Occurance (Before) PART WITH PIN FLASH
442_Occurance_Before.jpeg
Occurance (After) EJECTOR PIN DIA INCREASE
442_Occurance_After.jpeg
Outflow (Before) PART WITH PIN FLASH
442_Outflow_Before.jpeg
Outflow (After) SAMPLE PLACED ON FINAL STAGE
442_Outflow_After.jpeg
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant NO
 
12. Document Review
Documents InspCheckSheet
Specify Other Document PART DISPLAY
 
13. Effectiveness Of Action
Reviewed Quantity 10
Reason for submission Corrective action parts submission.