QFR No - 7000951520
Defect Details
NC No. 7000951520
NC Date 10/10/2023
NC Submission Date
Part No. F1LG00902B
Part Name SEAT PIPE -K86A
Supplier Name & Code 101263-SINGLA PRECISION SCREWS
ETL Plant 1136-ETL Suspension Sanand
Defect Details LENGTH UNDERSIZE-Total length undersize
 
1. Problem Description
Defect Description Seat pipe K86 total length found undersize 146.47 mm against specification 152 -0.2 mm
Detection Stage Inprocess
Problem Severity Fitment
NG Quantity 72
Is Defect Repeatative? No
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID quality@singlaprecision.com
Plant Head/CEO Email ID quality@singlaprecision.com
MD Email ID aditya@singlaprecision.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
8000
0
0
0
0
8000
Check Qty
8000
0
0
0
0
8000
NG Qty
72
0
0
0
0
72
 
Scrap 72
Rework 0
Under Deviation 0
Containment Action
Stock check 100% at our end.
 
3. Process Flow
Process Flow Description
Forging-Drilling& Flash Turning-Rough Grinding-CNC-1st-CNC-2nd-Punching-Filling-Reaming-Tapping-Final Grinding-Final Inspection-Packing
 
4. Process Details
Process / Operation Packing
Outsource No
Machine / Cell 01
Machine / Cell No. 02
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MethodTwo types pf samples packed at same time & same place.YesO
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Sampling
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 80
7. Root Cause Analysis (Occurance)
Why 1 Total length short pcs. reached at customer end
Why 2 The problem occurred at packing stage
Why 3 Two types of samples packed at same time same place
Why 4 Operator was unaware and some mix material packed in boxes
Why 5 So mixed material reached at customer end
Root Cause (Occurance) Two types of samples packed at same time & same place.
 
Root Cause Analysis (Outflow)
Why 1 Total length short pcs. reached at customer end
Why 2 100% inspection is not done at packing stage
Why 3 Inspection is also as per sampling plan
Why 4 So final inspection person not caught this defect
Why 5 So NG parts dispatched to customer end
Root Cause (Outflow) Two types of samples packed at same time & same place.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OutflowSingle sample packed at a timeQuality Head16/10/202316/10/2023Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System No
Change Details No
Inspection Method Instrument
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size as per pla
10. Evidance of Countermeasure
Occurance (Before) Two types of samples packed at a time on same place
572_Occurance_Before.jpeg
Occurance (After) some type material use deference bin
572_Occurance_After.jpeg
Outflow (Before) Two types of samples packed at a time on same place not use different bin some types bin use
572_Outflow_Before.jpeg
Outflow (After) Single sample packed at a time and deferent bin use
572_Outflow_After.jpeg
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant Packing
 
12. Document Review
Documents WISOP
Specify Other Document OPL
 
13. Effectiveness Of Action
Reviewed Quantity 5
Reason for submission Seat pipe K86 total length found undersize 146.47 mm against specification 152 -0.2 mm