QFR No - 7000951785
Defect Details
NC No. 7000951785
NC Date 11/10/2023
NC Submission Date
Part No. F1DZ00902B
Part Name FORK BOLT K86A
Supplier Name & Code 100106-SHARP ENGINEERS.
ETL Plant 1136-ETL Suspension Sanand
Defect Details FITTMENT NOT OK.-Wrong part
 
1. Problem Description
Defect Description Fork bolt K86 found other model / wrong parts .
Detection Stage Receipt
Problem Severity Fitment
NG Quantity 272
Is Defect Repeatative? No
Defect Sketch / Photo ekltmoemj1irgygxc21udo1u.jpg
Supplier Communication Details
Quality Head Email ID quality@apw3.co.in
Plant Head/CEO Email ID kurund.ma@sharp-engineers.com
MD Email ID urkhandelwal@sharp-engineers.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
1440
7200
0
2000
1400
12040
Check Qty
1440
7200
0
2000
1400
12040
NG Qty
272
0
0
0
0
272
 
Scrap 272
Rework 0
Under Deviation 0
Containment Action
All material at ETL end ,warehouse and inhouse checked and verify.
 
3. Process Flow
Process Flow Description
10) RM INWARD 20) RM STORAGE 30) TRAUB PARTING AND DRILLING 40) GRINDING 50)MILLING 60) CNC LATHE TURNING 70) ROLLING 80) PLATING 90) PLATING INWARD 100) FINAL INSPECTION 110) PRE DISPATCH INSPECTION 120) PACKING AND DISPATCH.
 
4. Process Details
Process / Operation Storage (Warehouse)
Outsource Yes
Machine / Cell NA
Machine / Cell No. NA
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MaterialRaw material is not as per required specifications.Verify the raw material as per required size and grade found ok.O
MachineMachining not done as per process sequence.Process flow verified as per required sequence and process flow found ok.O
MethodMaterial handling at Warehouse.Material mixup at the time of dispatch from warehouse to ETL.X
ManUn-skilled operatorVerify the stagewise skill matrix and found okO
ToolTool wear out before as required life.Tool life as per required frequency monitoring found ok.O
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Warehouse Storage.
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size Bag to bag
7. Root Cause Analysis (Occurance)
Why 1 Wrong part found with fork bolt K86.
Why 2 Material unknowingly dispatch with required parts.
Why 3 Packed material lying near each other.
Why 4 Packing person dont know the difference between the both parts.
Why 5 unskilled packing person at warehouse.
Root Cause (Occurance) Unskilled packing person at warehouse.
 
Root Cause Analysis (Outflow)
Why 1 Wrong part found with fork bolt K86.
Why 2 Incorrect material selection for the dispatch to ETL.
Why 3 Person not aware about the parts.
Why 4 Same colour identification tag on packing box for both parts.
Why 5
Root Cause (Outflow) Same colour identification tag on packing box for both parts.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OutflowOPL display at warehouse for part identification and packing identification tag.Mr. Jagdish Ninayade23/10/202324/10/2023Completed
OccurancePacking material identification tag on the box will be change as per ETL Plant.Mr.Yogesh Sonune23/10/202330/10/2023Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details 100 % inspection at dispatch stage and also at warehouse location.
Inspection Method Other
Other Inspection Method Visual inspection
Check Point at Final Inspection No
Checking Freq. 100%
Sampling No
Sample Size bag to bag
10. Evidance of Countermeasure
Occurance (Before) No any material part visualization display at warehouse storage of Transporter.
570_Occurance_Before.xlsx
Occurance (After) One point lesson given to warehouse person about part visualization.
570_Occurance_After.ppt
Outflow (Before) Both parts of ETL plant having same colour identification tag on the packing box.
570_Outflow_Before.xlsx
Outflow (After) Colour identification change from Yellow identification tag to White identification tag.
570_Outflow_After.jpeg
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant NA
 
12. Document Review
Documents PackingStd
Specify Other Document NA
 
13. Effectiveness Of Action
Reviewed Quantity 5
Reason for submission Wrong parts (fitment not OK)