QFR No - 7000966074
Defect Details
NC No. | 7000966074 |
NC Date | 08/12/2023 |
NC Submission Date | |
Part No. | 520FW04702 |
Part Name | CLUTCH HOUSING FULL FINISHED-K70 |
Supplier Name & Code | 100656-MADHURA DIE CAST PVT.LTD |
ETL Plant | 1132-ETL K-226/1 TRANSMISSION |
Defect Details | OXDISED-Oxidised issue |
1. Problem Description
Defect Description | Heavy Oxidation Issue |
Detection Stage | Inprocess |
Problem Severity | Aesthetic |
NG Quantity | 504 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | madhuradiecast@gmail.com |
Plant Head/CEO Email ID | madhuradiecast@gmail.com |
MD Email ID | madhuradiecast@gaikegroup.in |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
1000
|
1000
|
0
|
500
|
300
|
2800
|
Check Qty |
1000
|
1000
|
0
|
500
|
300
|
2800
|
NG Qty |
12
|
0
|
0
|
0
|
0
|
12
|
Scrap | 12 |
Rework | 0 |
Under Deviation | 0 |
Containment Action |
---|
.100% Stock segregate at customer end and Supplier end stock. |
3. Process Flow
Process Flow Description |
---|
1.Casting 2. fetling 3. CNC 1st Set-up 4.CNC 2nd Set-up 5.Final Inspection |
4. Process Details
Process / Operation | Casting |
Outsource | No |
Machine / Cell | HPDC |
Machine / Cell No. | 01 |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Man | Unskill Operator On machine. | Skill Matrix Varified & Found OK. | O |
Machine | water was leakage in die | Checking water leakage & Found ok | O |
Tool | air spray gun is not in working condition | checking air spray gun found in working condition | O |
Method | MIDC regular water supply was not available | MIDC regular water supply was not available | X |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | Visual Inspection |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 1:1 |
7. Root Cause Analysis (Occurance)
Why 1 | Oxidised Issue |
Why 2 | Because water PH value is high. |
Why 3 | We used Tanker water |
Why 4 | Because MIDC regular water supply was not available . |
Why 5 | |
Root Cause (Occurance) | Because MIDC regular water supply was not available . |
Root Cause Analysis (Outflow)
Why 1 | Oxidised Issue |
Why 2 | 100% inspection not done |
Why 3 | |
Why 4 | |
Why 5 | |
Root Cause (Outflow) | checking was sampling basis |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Occurance | 1.Regular MIDC water supply is started. 2. If MIDC Water is not available we will discuss with Management. | PRODUCTION SUPERVISOR | 21/12/2023 | 20/12/2023 | Completed |
Outflow | 1. 100% die coated part separated & its inspection started. 2.Visual checking Eye Sequence Chart Displayed on Board. | QUALITY SUPERVISOR | 21/12/2023 | 20/12/2023 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | 1. 100% die coated part separated & its inspection started. 2.Visual checking Eye Sequence Chart Displayed on Board. |
Inspection Method | Other |
Other Inspection Method | Visual checking |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 1:1 |
10. Evidance of Countermeasure
Occurance (Before) |
1.MIDC regular water supply was not available . 610_Occurance_Before.jpg |
Occurance (After) |
1.Regular MIDC water supply is started.
2. If MIDC Water is not available we will discuss with Management. 610_Occurance_After.jpg |
Outflow (Before) |
100% inspection not done 610_Outflow_Before.jpg |
Outflow (After) |
1. 100% die coated part separated & its inspection started.
2.Visual checking Eye Sequence Chart Displayed on Board. 610_Outflow_After.pdf |
11. Horizontal Deployment
Horizontal Deployment Required | No |
Applicable Machine / Model / Plant | NA |
12. Document Review
Documents | ControlPlan, PFMEA, WISOP, InspCheckSheet |
Specify Other Document | EYE SEQUENCE CHART |
13. Effectiveness Of Action
Reviewed Quantity | 1000 |
Reason for submission | Alternative of MIDC Water not available -Again possibility of defect generation if MIDC water not available |