QFR No - 7000985666
Defect Details
NC No. 7000985666
NC Date 14/02/2024
NC Submission Date
Part No. F1FA01333M
Part Name FORK PIPE MACHINED-K86A
Supplier Name & Code 101109-TUBE INVESTMENTS OF INDIA LIMI
ETL Plant 1136-ETL Suspension Sanand
Defect Details LENGTH UNDERSIZE-(Short length)
 
1. Problem Description
Defect Description Length undersize 287.89 mm against specification 288.3+0.2/-0.2.
Detection Stage Receipt
Problem Severity Fitment
NG Quantity 215
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID SushantJadhav@tii.murugappa.com
Plant Head/CEO Email ID BhatnagarS@tii.murugappa.com
MD Email ID mukeshahuja@tii.murugappa.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
2500
0
0
1500
0
4000
Check Qty
2500
0
0
1500
0
4000
NG Qty
215
0
0
12
0
227
 
Scrap 227
Rework 0
Under Deviation 0
Containment Action
100% inspection done for Tube Total Length on Height Gauge.
 
3. Process Flow
Process Flow Description
RM - CNC MACHINING - DRILLING - Deburring - Inspection - Bin Packing - Dispatch.
 
4. Process Details
Process / Operation CNC Machining
Outsource No
Machine / Cell CNC Machineing
Machine / Cell No. cell No-3
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MaterialRaw tube OD U/sVerified Records & found okO
ManTube come back due to Back PressureVerified through Gamba &found Tube come back due to Back Pressure. Operator has to Judge for restingX
ManSOP not FollowedVerified through Gemba observation and found Operator has followed the SOP.O
MachineMachine ParameterVerified through Gemba observation and found all Machine Parameter as per Control PlanO
MethodWrong SetupVerified Setup Repots & found OK.O
 
6. Inspection Method Analysis (Current)
Inspection Method Pokayoke
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 10 Nos
7. Root Cause Analysis (Occurance)
Why 1 Length under size found at customer end
Why 2 Excess Material cut during Tube facing operation in CNC Machining.
Why 3 Tube hold away from Stopper.
Why 4 Tube come back due to Back Pressure. Operator has to Judge for resting on Stopper.
Why 5 Low awareness of Operator.
Root Cause (Occurance) Low awareness of Operator for proper Tube resting on Stopper.
 
Root Cause Analysis (Outflow)
Why 1 Length under size found at customer end
Why 2 Short length not detected By Sensor on Drilling M/c
Why 3 Drilling Fixture Poka -Yoke Senor Malfunction.
Why 4
Why 5
Root Cause (Outflow) Drilling Fixture Poka -Yoke Senor Malfunction.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OutflowIn Final Inspection added for 100 % Inspection with Conventional Length Gauge for Next 3 MonthsMr. Palak Shah28/02/202408/03/2024Completed
OccuranceTraining given to Operator for How to butting the Tube so Tube will not come Back from Stopper.Mr. Abishek Yadav27/02/202408/03/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details In Final Inspection added for 100 % Inspection with Conventional Length Gauge for Next 3 Month.
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
10. Evidance of Countermeasure
Occurance (Before) Low awareness to the Operator regarding proper Tube resting on the Stopper.
678_Occurance_Before.pdf
Occurance (After) awareness to the Operator regarding proper Tube resting on the Stopper.
678_Occurance_After.pdf
Outflow (Before) Drilling Fixture Poka -Yoke Sensor Malfunction.
678_Outflow_Before.pdf
Outflow (After) In addition to the Existing poka yoke, the Length inspection started on length Gauge & Started the 100% Length Verification with Length gauge.
678_Outflow_After.pdf
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant K86
 
12. Document Review
Documents
Specify Other Document OPL
 
13. Effectiveness Of Action
Reviewed Quantity 5
Reason for submission Total length undersize problem in fork pipe K86