QFR No - 7000987414
Defect Details
NC No. 7000987414
NC Date 20/02/2024
NC Submission Date
Part No. S2FF00802B
Part Name GAS CAP- K1 RSA GDC CANISTER
Supplier Name & Code 100318-JAIRAJ GLOBAL
ETL Plant 1126-ETL Pantnagar
Defect Details NOT AS PER SPECIFICATION-I/D Profile NG
 
1. Problem Description
Defect Description Fitment Issue :- Air Hose Valve fitting I/D Profile N/G.
Detection Stage Inprocess
Problem Severity Fitment
NG Quantity 3200
Is Defect Repeatative? No
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID agm@jairajgroup.com
Plant Head/CEO Email ID vp@jairajgroup.com
MD Email ID rajiv@jairajgroup.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
6200
0
0
0
0
6200
Check Qty
6200
0
0
0
0
6200
NG Qty
6200
0
0
0
0
6200
 
Scrap 6200
Rework 0
Under Deviation 0
Containment Action
Immediate stop the supply and segregate all material which was lying in pipe line .
 
3. Process Flow
Process Flow Description
Material receiving- Incoming inspection- material storage- RM issue to production- Pre drying- injection molding - de-flashing- final inspection- labeling & Packing - Dispatch
 
4. Process Details
Process / Operation Injection molding process
Outsource No
Machine / Cell injection molding machine
Machine / Cell No. IMM 01
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MaterialMaterial not as per gradeCheck with MTCO
MethodMachine parameter not as per OCSMachine parameter check with OCSO
ManUnskilled operatorCheck with Attendance sheet and skill matrixO
MachineMachine tonnage not as per requirementCheck with Control planO
ToolTool dimension wearmajor with instrumentX
 
6. Inspection Method Analysis (Current)
Inspection Method Instrument
Other Inspection Method
Check Point at Final Inspection No
Checking Freq. Sampling
Sampling No
Sample Size 5
7. Root Cause Analysis (Occurance)
Why 1 ID profile of gas cap is NG
Why 2 Gas cap ID was under size
Why 3 Under size due to angle of tool pin is not as per specification
Why 4 Tool pin wear out
Why 5
Root Cause (Occurance) Due to tool pin was wear this problem was occurred.
 
Root Cause Analysis (Outflow)
Why 1 ID profile of gas cap is NG
Why 2 Not deduct at the time of setup inspection
Why 3 this dimension was not mention in setup check sheet.
Why 4 Check this dimension at the time of Lay out inspection.
Why 5
Root Cause (Outflow) This dimension is not checked at the time of setup. It was checked in layout only.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceCheck point added in tool preventive maintenance check sheet for inspect pin at the time of preventive maintenance.Brijesh08/03/2024Completed
OutflowCheck point added in setup Check sheet.Kabir08/03/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Checkpoint added in setup approval check sheet and PDIR to check One no`s of both cavity in every setup approval and PDIR.
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 5
10. Evidance of Countermeasure
Occurance (Before) Tool PM Check Sheet
686_Occurance_Before.pdf
Occurance (After) Updated Tool PM Check sheet
686_Occurance_After.pdf
Outflow (Before) Setup Approval Check sheet
686_Outflow_Before.pdf
Outflow (After) Updated Setup Approval Check Sheet
686_Outflow_After.pdf
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant Horizontal deploy on Gas cap BS4 Model
 
12. Document Review
Documents ControlPlan, PMCheckSheet, PFMEA, InspCheckSheet
Specify Other Document NO
 
13. Effectiveness Of Action
Reviewed Quantity 10000
Reason for submission Its OK Now