QFR No - 7001001044
Defect Details
NC No. 7001001044
NC Date 28/03/2024
NC Submission Date
Part No. 53BKZ00102
Part Name RUBBER BUSH
Supplier Name & Code 101023-FORES ELASTOMECH INDIA PVT. LT
ETL Plant 1136-ETL Suspension Sanand
Defect Details DIMETER UNDERSIZE-OD undersize
 
1. Problem Description
Defect Description OD 24.3+0.3/-0.3 observed undersize 23.70 mm.
Detection Stage Receipt
Problem Severity Fitment
NG Quantity 17500
Is Defect Repeatative? No
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID malani.pritam@foresgroup.com
Plant Head/CEO Email ID singh.barinder@foresgroup.com
MD Email ID swamy.pj@foresgroup.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
17500
40000
0
0
0
57500
Check Qty
17500
40000
0
0
0
57500
NG Qty
10
0
0
0
0
10
 
Scrap 9
Rework 0
Under Deviation 0
Containment Action
100 % sorting of Fores stock
 
3. Process Flow
Process Flow Description
Material inward then forward to mixing department after that forward to molding process after that final inspection to standard packing.
 
4. Process Details
Process / Operation Moulding
Outsource No
Machine / Cell Hyd 250 T
Machine / Cell No. 250 T
5. Problem Analysis
Type Possible Cause Fact Verification Jud
Methodbuffing processBuffing process at parting lineO
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Venier
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 50
7. Root Cause Analysis (Occurance)
Why 1 OD undersize
Why 2 OD undersize on parting line
Why 3 undersize at parting line de-flash portion
Why 4 OD undersize due to buffing process at parting line
Why 5
Root Cause (Occurance) OD undersize due to buffing process at parting line
 
Root Cause Analysis (Outflow)
Why 1 OD undersize
Why 2 Skipped from Inspection
Why 3
Why 4
Why 5
Root Cause (Outflow) Skipped from Inspection
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceBuffing process removed.Fores10/04/2024Pending
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Training given to Inspector & OPL displayed.
Inspection Method Other
Other Inspection Method vernier
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 50
10. Evidance of Countermeasure
Occurance (Before) Parting line De-flashing by buffing wheel
728_Occurance_Before.jpg
Occurance (After) De-flashing process removed.
728_Occurance_After.jpg
Outflow (Before) OD inspection at sampling basis
728_Outflow_Before.jpg
Outflow (After) OD inspection at sampling basis, Sampling Quantity increase.
728_Outflow_After.pdf
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant Rubber bush
 
12. Document Review
Documents
Specify Other Document OPL
 
13. Effectiveness Of Action
Reviewed Quantity
Reason for submission