QFR No - 7001032025
Defect Details
NC No. 7001032025
NC Date 10/07/2024
NC Submission Date
Part No. B20708200O
Part Name END CON ASM ABS SIDE- ABS 2 FR MC K42CH
Supplier Name & Code 101221-SUNREN AUTOMOTIVE PRIVATE LIMI
ETL Plant 1120-ETL K-226/2 Disc Brakes
Defect Details RUSTY-rusty
 
1. Problem Description
Defect Description RUSTY-rusty
Detection Stage Receipt
Problem Severity Aesthetic
NG Quantity 300
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID shivank@sunren.in
Plant Head/CEO Email ID sanjayrana@sunren.in
MD Email ID subhashsaini@sunren.in
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
2800
3800
800
500
1500
9400
Check Qty
2800
3800
800
500
1500
9400
NG Qty
300
0
0
0
0
300
 
Scrap 0
Rework 300
Under Deviation 0
Containment Action
Re-Plating
 
3. Process Flow
Process Flow Description
Plating
 
4. Process Details
Process / Operation Plating
Outsource Yes
Machine / Cell 01
Machine / Cell No. 01
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MethodWrong MethodWrong Method FollowedO
ManLack of KnowledgeSkilledX
ManLack Of AwarenessTraining RequiredO
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 5
7. Root Cause Analysis (Occurance)
Why 1 Due to presence of water.
Why 2 Due to no. of bends , in the part water gets accumulated at the bends.
Why 3 Pressurized air not passed through the bends of the part.
Why 4 Not Define in SOP.
Why 5 Lack of Awareness
Root Cause (Occurance) Pressurized Air not passes through the bends of the parts after plating operation.
 
Root Cause Analysis (Outflow)
Why 1 Rust cannot be detected at the same time and takes time to occur.
Why 2 Depends on storage conditions also.
Why 3
Why 4
Why 5
Root Cause (Outflow) Rust takes time to occur and cannot be detected at the same time.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OutflowRust Oil will be passed through the bend of the part after plating operation.Krishna Plating30/07/202430/07/2024Completed
OccurancePressurized Air will be passed through the bends of the parts after plating operation.Krishna Plating30/07/202430/07/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Rust oil will be passed through the end bend of the part after plating operation and it`s inspection.
Inspection Method Other
Other Inspection Method Visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 5
10. Evidance of Countermeasure
Occurance (Before) No Air Passes Through Bend After Plating Operation
932_Occurance_Before.jpg
Occurance (After) Air will be pass through bend after plating operation.
932_Occurance_After.jpeg
Outflow (Before) Rust Oil was applied over the surface of the part.
932_Outflow_Before.jpeg
Outflow (After) Rust oil will be pass through the bend of the part,.
932_Outflow_After.jpeg
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant B20707800O
 
12. Document Review
Documents
Specify Other Document OPL
 
13. Effectiveness Of Action
Reviewed Quantity 100
Reason for submission ok