QFR No - 8000780349
Defect Details
NC No. | 8000780349 |
NC Date | 18/03/2022 |
NC Submission Date | |
Part No. | F1GN01102B |
Part Name | MAIN SPRING K86A |
Supplier Name & Code | 101225-HELICAL SPRINGS |
ETL Plant | 1146-ETL Suspension Narasapura |
Defect Details | LENGTH UNDERSIZE-TOTAL LENGTH LESS ISSUE |
1. Problem Description
Defect Description | main spring total length less |
Detection Stage | Inprocess |
Problem Severity | Fitment |
NG Quantity | 1 |
Is Defect Repeatative? | No |
Defect Sketch / Photo | ilia2cr5nev23hks14ow220m.xlsx |
Supplier Communication Details
Quality Head Email ID | arun@helicalsprings.in |
Plant Head/CEO Email ID | shaikhmoin@helicalsprings.in |
MD Email ID | ataneja@helicalsprings.in |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
10000
|
8000
|
0
|
0
|
12000
|
30000
|
Check Qty |
10000
|
8000
|
0
|
0
|
12000
|
30000
|
NG Qty |
5
|
0
|
0
|
0
|
0
|
5
|
Scrap | 5 |
Rework | 0 |
Under Deviation | 0 |
Containment Action |
---|
100 % inspection done at ETL, warehouse & FG. |
3. Process Flow
Process Flow Description |
---|
RAW MATERIAL, COILING, STRESS RELEIVING-1, END GRINDING, SHOT PEENING, SCRAGGING, LENGTH,OD & WAVYNESS CHECKING, STRESS RELEIVING-2, Surface Finish- Oiling , PDI, Packing & Dispatch. |
4. Process Details
Process / Operation | Coiling |
Outsource | No |
Machine / Cell | NA |
Machine / Cell No. | NA |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Method | Improper length setting | Improper locking of length gauge | X |
Material | As per Drawing | RMTC checked found ok | O |
Machine | Herdon | Found ok | O |
Man | Unskilled operator | Skill Matrix checked found ok | O |
Method | Improper material handing | Setup part mix with ok part | X |
6. Inspection Method Analysis (Current)
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 5 |
7. Root Cause Analysis (Occurance)
Why 1 | length short |
Why 2 | During setup length short spring coiled |
Why 3 | Setup quantity mix with the ok material |
Why 4 | No provision was available for setup part storage |
Why 5 | |
Root Cause (Occurance) | No provision was available for setup part storage |
Root Cause Analysis (Outflow)
Why 1 | length short |
Why 2 | Length gauge setting disturbed |
Why 3 | Improper locking of Length gauge |
Why 4 | No cross check method for length gauge verification |
Why 5 | |
Root Cause (Outflow) | No cross check method for length gauge verification |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Occurance | 1. Yellow bin introduced at coiling to keep suspected/setup part 2. OPL displayed at coiling 3. Training provided to the operator and recorded the same | Mr.Mahadev | 23/03/2022 | 22/03/2022 | Completed |
Outflow | 1. Free length tolerance band reduced from +4.0 mm to +3.50 mm 2. Dedicated length gauge will be introduced for K0LA main spring (fixed type) 3. Control plan changed and updated | Quality | 24/03/2022 | 23/03/2022 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | No |
Change Details | No Change |
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 25/Lot |
10. Evidance of Countermeasure
Occurance (Before) |
Yellow Bin not available. 21_Occurance_Before.pdf |
Occurance (After) |
.1. Yellow bin introduced at coiling to keep suspected/setup part
2. .OPL displayed at coiling
3.Training provided to to the operator and recorded the same 21_Occurance_After.pdf |
Outflow (Before) |
Free length Gauge band 4.0 mm 21_Outflow_Before.pdf |
Outflow (After) |
1. The free length tolerance band was reduced from +4.0 mm to +3.50 mm
2. A dedicated length gauge will be introduced for K0LA main spring (fixed type) 21_Outflow_After.pdf |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | All Similar Modal |
12. Document Review
Documents | WISOP |
Specify Other Document | OPL |
13. Effectiveness Of Action
Reviewed Quantity | 15000 |
Reason for submission | reviewed 15000 numbers no length issue found ok |