QFR No - 8000782049
Defect Details
NC No. | 8000782049 |
NC Date | 27/03/2022 |
NC Submission Date | |
Part No. | F1GN01102B |
Part Name | MAIN SPRING K86A |
Supplier Name & Code | 101225-HELICAL SPRINGS |
ETL Plant | 1136-ETL Suspension Sanand |
Defect Details | HIGHT U/SIZE.-TOTAL HIGHT UNDERSIZE |
1. Problem Description
Defect Description | Total Length Under Size and Over Size i.e. 244.42, 213.11 mm |
Detection Stage | Receipt |
Problem Severity | Fitment |
NG Quantity | 231 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | arun@helicalsprings.in |
Plant Head/CEO Email ID | shaikhmoin@helicalsprings.in |
MD Email ID | ataneja@helicalsprings.in |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
12000
|
16000
|
0
|
5800
|
6000
|
39800
|
Check Qty |
10000
|
16000
|
0
|
5800
|
6000
|
37800
|
NG Qty |
231
|
42
|
0
|
58
|
0
|
331
|
Scrap | 273 |
Rework | 58 |
Under Deviation | 0 |
Containment Action |
---|
100% inspection done for length at ETL & Warehouse. |
3. Process Flow
Process Flow Description |
---|
Raw Material Receipt & Inspection, Coiling, Stress Relieving, End Grinding, Shot Peening, Scragging, Length & Wavyness checking, Strain-aging, Surface Finish- Oiling, Final Inspection/ PDI, Packing, Dispatch |
4. Process Details
Process / Operation | Coiling |
Outsource | No |
Machine / Cell | NA |
Machine / Cell No. | CNC Coiling |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Man | Unskilled operator | Skill Matrix checked found ok | O |
Method | Improper length setting | Improper locking of length gauge | X |
Material | As per Drawing | RMTC checked found ok | O |
Method | 1.Improper material handing | Setup part mix with ok part | X |
Machine | Herdon | Found ok | O |
6. Inspection Method Analysis (Current)
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 29 / 10000 |
7. Root Cause Analysis (Occurance)
Why 1 | length short |
Why 2 | During setup length short spring coiled |
Why 3 | Setup quantity mix with the ok material |
Why 4 | No provision was available for setup part storage |
Why 5 | |
Root Cause (Occurance) | No provision was available for setup part storage |
Root Cause Analysis (Outflow)
Why 1 | length short |
Why 2 | Length gauge setting disturbed |
Why 3 | Improper locking of Length gauge |
Why 4 | No cross check method for length gauge verification |
Why 5 | |
Root Cause (Outflow) | No cross check method for length gauge verification |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Outflow | 1.Free length tolerance band reduced from +4.0 mm to +3.50 mm 2.Dedicated length gauge will be introduced for K0LA main spring (fixed type) 3.Control plan changed and updated | Arun Kumar | 30/03/2022 | 28/03/2022 | Completed |
Occurance | 1.Yellow bin introduced at coiling to keep suspected/setup part 2.OPL displayed at coiling 3.Training provided to the operator and recorded the same | Arun Kumar | 30/03/2022 | 24/03/2022 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | Free length tolerance band reduced from +4.0 mm to +3.50 mm |
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | 29 / 10000 |
10. Evidance of Countermeasure
Occurance (Before) |
Yellow bin not Available 25_Occurance_Before.pdf |
Occurance (After) |
Yellow bin introduced at coiling to keep suspected/setup part 25_Occurance_After.pdf |
Outflow (Before) |
Free length gauge tolerance 4.00 mm 25_Outflow_Before.pdf |
Outflow (After) |
Free length tolerance band reduced from +4.0 mm to +3.50 mm 25_Outflow_After.pdf |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | All Similar Part. |
12. Document Review
Documents | |
Specify Other Document | OPL |
13. Effectiveness Of Action
Reviewed Quantity | 1000 |
Reason for submission | Verified and found effective till date |