QFR No - 8000782143
Defect Details
NC No. 8000782143
NC Date 28/03/2022
NC Submission Date
Part No. 580DV00102
Part Name GEAR CONTROL PULLY H BAR ASSLY(24191184)
Supplier Name & Code 101086-PUNE POLYMERS PVT. LTD.
ETL Plant 1102-ETL L-6 Die Casting
Defect Details FITTMENT NOT OK.-HOLE SHIFT
 
1. Problem Description
Defect Description Diameter 2.2 Shift
Detection Stage Inprocess
Problem Severity Fitment
NG Quantity 669
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID qa.waluj@punepolymers.com
Plant Head/CEO Email ID planthead.waluj@punepolymers.com
MD Email ID s.gupta@punepolymers.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
5000
0
0
1500
1500
8000
Check Qty
5000
0
0
1500
1500
8000
NG Qty
550
0
0
0
0
550
 
Scrap 550
Rework 0
Under Deviation 0
Containment Action
100 % inspection done for all material in stock.
 
3. Process Flow
Process Flow Description
In. molding - Inspection - packing - Dispatch
 
4. Process Details
Process / Operation Inj. molding
Outsource No
Machine / Cell Cell A
Machine / Cell No. Cell A
5. Problem Analysis
Type Possible Cause Fact Verification Jud
ToolPin bent in mold.Pin bent in mold.O
 
6. Inspection Method Analysis (Current)
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 10
7. Root Cause Analysis (Occurance)
Why 1 Fitment not ok
Why 2 Hole shift
Why 3 Pin bent in mold.
Why 4
Why 5
Root Cause (Occurance) Pin bent in mold.
 
Root Cause Analysis (Outflow)
Why 1 Skipped from inspection.
Why 2 Not detected in sampling.
Why 3
Why 4
Why 5
Root Cause (Outflow) Not detected in sampling.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccurancePin replaced in the mold.PPPL15/04/202215/04/2022Completed
Outflow100 % inspectionPPPL05/04/202205/04/2022Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details 100 % inspection.
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100 %
10. Evidance of Countermeasure
Occurance (Before) Pin bent
30_Occurance_Before.xls
Occurance (After) Pin replaced.
30_Occurance_After.xls
Outflow (Before) Sampling inspection.
30_Outflow_Before.xls
Outflow (After) 100 % inspection.
30_Outflow_After.xls
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant NA
 
12. Document Review
Documents ControlPlan, PFMEA, WISOP, InspCheckSheet
Specify Other Document NA
 
13. Effectiveness Of Action
Reviewed Quantity 50000
Reason for submission Monitor for next one month & no issue observed