QFR No - 8000782620
Defect Details
NC No. 8000782620
NC Date 03/04/2022
NC Submission Date
Part No. F1LG00902B
Part Name SEAT PIPE -K86A
Supplier Name & Code 100538-NARINDER PARKASH AND CO
ETL Plant 1136-ETL Suspension Sanand
Defect Details NOT AS PER SPECIFICATION-TOTAL LENGTH UNDER SIZE I.E. 148.89 MM
 
1. Problem Description
Defect Description Total Length Under Size
Detection Stage Inprocess
Problem Severity Fitment
NG Quantity 1
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID quality@npcindustries.in
Plant Head/CEO Email ID anand@npcindustries.in
MD Email ID ajay@npcindustries.in
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
20000
7000
15000
0
0
42000
Check Qty
20000
7000
15000
0
0
42000
NG Qty
4
3
0
0
0
7
 
Scrap 7
Rework 0
Under Deviation 0
Containment Action
Lock & Key type rejection bins to be implemented at work station.
 
3. Process Flow
Process Flow Description
1.RM Receipt 2. Cutting 3.Multistation Draw 4. Head Formation 5. Rough Grinding 6. Punching 7. CNC Head Turning & Chamfering 8. CNC Boring & Facing 9. Thread M8x1.25 Tapping 10. Chamfering-1 11. Chamfering-2 12. ID Deburring 13. Finish Grinding 14. Final Inspection 15. ID Cleaning 16. Oiling 17. Packing & Dispatch 18. Transportation.
 
4. Process Details
Process / Operation CNC Boring & Facing
Outsource No
Machine / Cell CNC
Machine / Cell No. NP/CNC/013
5. Problem Analysis
Type Possible Cause Fact Verification Jud
ManQuality Inspector negligentQuality Inspector found to be non-negligent and performed his duty with diligenceO
MethodOperator located part incorrectlyVerified found OKO
MethodOther model mixed during processingVerified found OKO
ManOpeartor located part incorrectlyVerified found OKO
MethodCNC Stopper design inadequateVerified found OKO
MethodCNC vernier not calibratedVerified found OKO
MethodNG setting part mixedVerified found not OKX
MethodUsage of open Red BinsVerified found not OKX
 
6. Inspection Method Analysis (Current)
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size Asper plan
7. Root Cause Analysis (Occurance)
Why 1 Total length undersize
Why 2 NG Setting part with length undersize passed
Why 3 NG Setting part mixed in OK parts
Why 4 Usage of open Red Bins
Why 5
Root Cause (Occurance) Usage of open Red Bins
 
Root Cause Analysis (Outflow)
Why 1 Total Length undersize
Why 2 Could not be detected at Final Inspection
Why 3 Skipped in Sampling at Final Inspection
Why 4
Why 5
Root Cause (Outflow) Skipped in Sampling at Final Inspection
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceTraining to be provided to line supervisor and all line operatorsMr Gurpreet11/04/2022Completed
OccuranceLock & Key type rejection bins to be implemented at work station (Only part drop down and not pick up from Bin)Mr Mohinderpal12/04/2022Completed
OccuranceQuality Alert to be displayed at work stationMr. Lokesh04/04/2022Completed
Outflow100% marking after total length inspection to be doneMr. Ankush07/04/2022Completed
OutflowQuality alert to be displayed at final inspectionMr. Lokesh04/04/2022Completed
OccuranceSetting NG part to be damaged by shift supervisor.Mr. Gursewak Singh07/04/2022Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Sampling plan is doubled
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size double
10. Evidance of Countermeasure
Occurance (Before) Open Red Bin
41_Occurance_Before.png
Occurance (After) Lock & Key type rejection bins at work station (Only part drop down and not pick up from Bin)
41_Occurance_After.jpg
Outflow (Before) As per Sampling Plan
41_Outflow_Before.jpg
Outflow (After) Sampling Plan Doubled
41_Outflow_After.png
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant Applicable all similar parts
 
12. Document Review
Documents ControlPlan, PFMEA
Specify Other Document No
 
13. Effectiveness Of Action
Reviewed Quantity
Reason for submission