QFR No - 8000785812
Defect Details
NC No. | 8000785812 |
NC Date | 29/04/2022 |
NC Submission Date | |
Part No. | S130206506 |
Part Name | DAMPER ASSY PAINTED PIAGGIO RR |
Supplier Name & Code | 206460-TULJA ENTERPRISES |
ETL Plant | 1118-ETL E-92,93 Suspension |
Defect Details | PANIT UNCOVER-PAINT UNCOVER |
1. Problem Description
Defect Description | Damper Assembly observed paint uncover |
Detection Stage | Receipt |
Problem Severity | Aesthetic |
NG Quantity | 18 |
Is Defect Repeatative? | No |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | |
Plant Head/CEO Email ID | |
MD Email ID |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
--
|
--
|
--
|
--
|
--
|
--
|
Check Qty |
--
|
--
|
--
|
--
|
--
|
--
|
NG Qty |
--
|
--
|
--
|
--
|
--
|
--
|
Scrap | |
Rework | |
Under Deviation |
Containment Action |
---|
-- |
3. Process Flow
Process Flow Description |
---|
-- |
4. Process Details
Process / Operation | |
Outsource | |
Machine / Cell | |
Machine / Cell No. |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|
6. Inspection Method Analysis (Current)
Inspection Method | |
Other Inspection Method | |
Check Point at Final Inspection | |
Checking Freq. | |
Sampling | |
Sample Size |
7. Root Cause Analysis (Occurance)
Why 1 | |
Why 2 | |
Why 3 | |
Why 4 | |
Why 5 | |
Root Cause (Occurance) |
Root Cause Analysis (Outflow)
Why 1 | |
Why 2 | |
Why 3 | |
Why 4 | |
Why 5 | |
Root Cause (Outflow) |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|
9. Inspection Method After Customer Complaint
Change In Inspection System | |
Change Details | |
Inspection Method | |
Other Inspection Method | |
Check Point at Final Inspection | |
Checking Freq. | |
Sampling | |
Sample Size |
10. Evidance of Countermeasure
Occurance (Before) |
|
Occurance (After) |
|
Outflow (Before) |
|
Outflow (After) |
|
11. Horizontal Deployment
Horizontal Deployment Required | |
Applicable Machine / Model / Plant |
12. Document Review
Documents | |
Specify Other Document |
13. Effectiveness Of Action
Reviewed Quantity | |
Reason for submission |