QFR No - 8000787544
Defect Details
NC No. 8000787544
NC Date 14/05/2022
NC Submission Date
Part No. 520KS00102
Part Name RIVET BR 100 CLUTCH
Supplier Name & Code 100049-METAFORGE ENGG.(I) PVT.LTD.
ETL Plant 1132-ETL K-226/1 TRANSMISSION
Defect Details CRACK-HEAD CRACK
 
1. Problem Description
Defect Description Head Crack
Detection Stage Inprocess
Problem Severity Function
NG Quantity 110
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID qa@metaforgeindia.com
Plant Head/CEO Email ID kaustubh@metaforgeindia.com
MD Email ID prajakt@metaforgeindia.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
9000
0
0
0
0
9000
Check Qty
9000
0
0
0
0
9000
NG Qty
9000
0
0
0
0
9000
 
Scrap 0
Rework 9000
Under Deviation 0
Containment Action
VIsual inspection- In sampling
 
3. Process Flow
Process Flow Description
Forging-Annealing-
 
4. Process Details
Process / Operation Forging
Outsource No
Machine / Cell Forging
Machine / Cell No. Forging
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MaterialLine marks on wire coilLine mark shankand headO
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method -
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100
7. Root Cause Analysis (Occurance)
Why 1 Head found crack
Why 2 During Head forging upsetting head found crack
Why 3 Line mark on RM coil surface are on some portion
Why 4
Why 5
Root Cause (Occurance) Line mark on RM coil surface are on some portion
 
Root Cause Analysis (Outflow)
Why 1 head found crack
Why 2 Not detect in visual inspection
Why 3
Why 4
Why 5
Root Cause (Outflow) Not detect in visual inspection
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceNot definedAdarsh15/06/202220/07/2022Completed
OutflowVision base system ( proposal sent to ETL)Adarsh15/06/202231/03/2023Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System No
Change Details 0
Inspection Method Other
Other Inspection Method -
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100
10. Evidance of Countermeasure
Occurance (Before) -
118_Occurance_Before.pdf
Occurance (After) -
118_Occurance_After.pdf
Outflow (Before) -
118_Outflow_Before.pdf
Outflow (After) -
118_Outflow_After.pdf
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant All rivet family
 
12. Document Review
Documents
Specify Other Document -
 
13. Effectiveness Of Action
Reviewed Quantity 50000
Reason for submission 1.OK-No Repetition of Defect Phenomenon (Outflow side action OK) 2.Occurrence Side action to be submit