QFR No - 8000788020
Defect Details
NC No. 8000788020
NC Date 19/05/2022
NC Submission Date
Part No. S2HS30443B
Part Name OUTER TUBE MARKED
Supplier Name & Code 101273-SAPTAGIRI ENGINEERING PRIVATE
ETL Plant 1136-ETL Suspension Sanand
Defect Details NOT AS PER SPECIFICATION-LOGO MISS
 
1. Problem Description
Defect Description Logo Miss
Detection Stage Inprocess
Problem Severity Aesthetic
NG Quantity 9
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID quality@saptagirigroup.in
Plant Head/CEO Email ID production@saptagirigroup.in
MD Email ID
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
6000
4000
0
1000
0
11000
Check Qty
6000
4000
0
1000
0
11000
NG Qty
9
0
0
5
0
14
 
Scrap 0
Rework 14
Under Deviation 0
Containment Action
All Suspected material identified for all location and 100% visual segregation done. Training given to operator and OPL & Q-Alert Displayed at Logo Marking Station, FI Station & PDI Station.
 
3. Process Flow
Process Flow Description
RM Inspection - Cutting - Chamfering - Buffing - Logo Marking - Final Inspection & RP Oil Application & Packing - PDI - Dispatch
 
4. Process Details
Process / Operation Logo Marking
Outsource No
Machine / Cell Roll Stamping Machine
Machine / Cell No. 02
5. Problem Analysis
-------
Type Possible Cause Fact Verification Jud
 
6. Inspection Method Analysis (Current)
Inspection Method
Other Inspection Method
Check Point at Final Inspection
Checking Freq.
Sampling
Sample Size
7. Root Cause Analysis (Occurance)
Why 1
Why 2
Why 3
Why 4
Why 5
Root Cause (Occurance)
 
Root Cause Analysis (Outflow)
Why 1
Why 2
Why 3
Why 4
Why 5
Root Cause (Outflow)
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
-------
Type Countermeasure Details Responsibility Target Date Actual Date Status
 
9. Inspection Method After Customer Complaint
Change In Inspection System
Change Details
Inspection Method
Other Inspection Method
Check Point at Final Inspection
Checking Freq.
Sampling
Sample Size
10. Evidance of Countermeasure
Occurance (Before)
Occurance (After)
Outflow (Before)
Outflow (After)
 
11. Horizontal Deployment
Horizontal Deployment Required
Applicable Machine / Model / Plant
 
12. Document Review
Documents
Specify Other Document
 
13. Effectiveness Of Action
Reviewed Quantity
Reason for submission