QFR No - 8000788020
Defect Details
NC No. | 8000788020 |
NC Date | 19/05/2022 |
NC Submission Date | |
Part No. | S2HS30443B |
Part Name | OUTER TUBE MARKED |
Supplier Name & Code | 101273-SAPTAGIRI ENGINEERING PRIVATE |
ETL Plant | 1136-ETL Suspension Sanand |
Defect Details | NOT AS PER SPECIFICATION-LOGO MISS |
1. Problem Description
Defect Description | Logo Miss |
Detection Stage | Inprocess |
Problem Severity | Aesthetic |
NG Quantity | 9 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | quality@saptagirigroup.in |
Plant Head/CEO Email ID | production@saptagirigroup.in |
MD Email ID |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
6000
|
4000
|
0
|
1000
|
0
|
11000
|
Check Qty |
6000
|
4000
|
0
|
1000
|
0
|
11000
|
NG Qty |
9
|
0
|
0
|
5
|
0
|
14
|
Scrap | 0 |
Rework | 14 |
Under Deviation | 0 |
Containment Action |
---|
All Suspected material identified for all location and 100% visual segregation done. Training given to operator and OPL & Q-Alert Displayed at Logo Marking Station, FI Station & PDI Station. |
3. Process Flow
Process Flow Description |
---|
RM Inspection - Cutting - Chamfering - Buffing - Logo Marking - Final Inspection & RP Oil Application & Packing - PDI - Dispatch |
4. Process Details
Process / Operation | Logo Marking |
Outsource | No |
Machine / Cell | Roll Stamping Machine |
Machine / Cell No. | 02 |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|
6. Inspection Method Analysis (Current)
Inspection Method | |
Other Inspection Method | |
Check Point at Final Inspection | |
Checking Freq. | |
Sampling | |
Sample Size |
7. Root Cause Analysis (Occurance)
Why 1 | |
Why 2 | |
Why 3 | |
Why 4 | |
Why 5 | |
Root Cause (Occurance) |
Root Cause Analysis (Outflow)
Why 1 | |
Why 2 | |
Why 3 | |
Why 4 | |
Why 5 | |
Root Cause (Outflow) |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|
9. Inspection Method After Customer Complaint
Change In Inspection System | |
Change Details | |
Inspection Method | |
Other Inspection Method | |
Check Point at Final Inspection | |
Checking Freq. | |
Sampling | |
Sample Size |
10. Evidance of Countermeasure
Occurance (Before) |
|
Occurance (After) |
|
Outflow (Before) |
|
Outflow (After) |
|
11. Horizontal Deployment
Horizontal Deployment Required | |
Applicable Machine / Model / Plant |
12. Document Review
Documents | |
Specify Other Document |
13. Effectiveness Of Action
Reviewed Quantity | |
Reason for submission |