QFR No - 8000790195
Defect Details
NC No. 8000790195
NC Date 06/06/2022
NC Submission Date
Part No. 260KN00107
Part Name RESERVOIR CAP POWDER COATED
Supplier Name & Code 100204-KRISHNA COATING
ETL Plant 1120-ETL K-226/2 Disc Brakes
Defect Details POWDER COATING NOT OK-COATING UNCOVER,DUST,PIN HOLES
 
1. Problem Description
Defect Description Powder Coating Uncover, dust
Detection Stage Receipt
Problem Severity Aesthetic
NG Quantity 740
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID qualitykrishnaassociates01@gmail.com
Plant Head/CEO Email ID ravikrishnacoating@gmail.com
MD Email ID krishnacoating@gmail.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
23450
0
0
0
0
23450
Check Qty
23450
0
0
0
0
23450
NG Qty
1782
0
0
0
0
1782
 
Scrap 0
Rework 1782
Under Deviation 0
Containment Action
Previously reservoir cap Coating on batch type line to resolve the uncover issue we shift coating from batch type to conveyor line And also dust mark issue also resolve because of close section of conveyor line.
 
3. Process Flow
Process Flow Description
Inward - Pretreatment - Drying - powder Coating- Baking- Final Inspection - dispatch.
 
4. Process Details
Process / Operation Powder Coating
Outsource No
Machine / Cell Powder coating Line
Machine / Cell No. Powder Coating Line
5. Problem Analysis
Type Possible Cause Fact Verification Jud
Machine1) Over Coated RodVisualX
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100
7. Root Cause Analysis (Occurance)
Why 1 Material Uncover issue?
Why 2 Proper Earthing not get to the Part.
Why 3 Over Coated rod
Why 4 Rod used for coating 2 times
Why 5
Root Cause (Occurance) Over Coated rod.
 
Root Cause Analysis (Outflow)
Why 1 Found Over Coated Rod
Why 2 We Shift Reservoir cap from batch type to conveyor line
Why 3
Why 4
Why 5
Root Cause (Outflow) Over Coated Rod.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceWe shift reservoir cap batch type coating to conveyor lineMr. Ajim Patel06/07/202206/06/2022Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System No
Change Details NA
Inspection Method Other
Other Inspection Method NA
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100
10. Evidance of Countermeasure
Occurance (Before) Batch type Before Loading Pattern for powder Coating
162_Occurance_Before.xlsx
Occurance (After) Conveyor line Loading Pattern for powder coating
162_Occurance_After.jpg
Outflow (Before) Batch type Before Loading Pattern for powder Coating
162_Outflow_Before.xlsx
Outflow (After) Conveyor line Loading Pattern for powder coating
162_Outflow_After.jpg
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant Conveyor line
 
12. Document Review
Documents ControlPlan, ProcessFlowChart
Specify Other Document NA
 
13. Effectiveness Of Action
Reviewed Quantity 12600
Reason for submission No defect found in Next 3 Lot