QFR No - 8000795498
Defect Details
NC No. 8000795498
NC Date 18/07/2022
NC Submission Date
Part No. 550LG06202
Part Name SEAT PIPE -K23A/PRFH-006
Supplier Name & Code 100929-HARSHAD ENGINEERING COMPANY
ETL Plant 1146-ETL Suspension Narasapura
Defect Details MIX UP OTHER MODEL-LENGTH LESS MIX UP NOT USING KON MODEL
 
1. Problem Description
Defect Description KON front fork seat pipe total length less mix up repeated issue compression one through hole available
Detection Stage Inprocess
Problem Severity Fitment
NG Quantity 50
Is Defect Repeatative? Yes
Defect Sketch / Photo hy34ct1limjq3bxzxoomdguv.xlsx
Supplier Communication Details
Quality Head Email ID qaharshad@gmail.com
Plant Head/CEO Email ID qaharshad@gmail.com
MD Email ID auto.mitesh@gmail.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
4000
0
0
2150
5550
11700
Check Qty
4000
0
0
0
0
4000
NG Qty
20
0
0
0
0
20
 
Scrap 20
Rework 0
Under Deviation 0
Containment Action
100 % sorting done for ETL End, HEC WIP & FG material
 
3. Process Flow
Process Flow Description
Cutting-Draw-Forging(Head Formation)-Rough Grinding-CNC (Head, Boring & Tapping)-Punching-Finish Grinding-Final Inspection-Packing-Dispatch
 
4. Process Details
Process / Operation Inspection & packing
Outsource No
Machine / Cell Packing & Inspection
Machine / Cell No. 120-A & B
5. Problem Analysis
Type Possible Cause Fact Verification Jud
ManMix-up while packing & InspectionMix-up while polybag filling& PackingO
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Visual Inspection
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100 %
7. Root Cause Analysis (Occurance)
Why 1 Mix-up with other model
Why 2 Mix-up while packing
Why 3 No separate color identification to polybag
Why 4 use standard polybag for packing
Why 5
Root Cause (Occurance) No separate color identification to polybag
 
Root Cause Analysis (Outflow)
Why 1 Mix-up with other model
Why 2 While polybag sealing manual parts counting done
Why 3 weight polybag & Box not done/Measured
Why 4
Why 5
Root Cause (Outflow) weight polybag & Box not done/Measured
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceYellow color polybag used for PRFHVAibhav29/07/202227/07/2022Completed
OutflowPolybag & box weight doneVaibhav29/07/202227/07/2022Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Box wt. done after packing on weighing scale & modelwise wt. chart displayed
Inspection Method Other
Other Inspection Method Manual Polybag fill
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100 %
10. Evidance of Countermeasure
Occurance (Before) standard color polybag used for all seat pipes
202_Occurance_Before.jpg
Occurance (After) Yellow color polybag used for PRFH seat pipe
202_Occurance_After.jpg
Outflow (Before) Box & polybag wt. not done
202_Outflow_Before.jpg
Outflow (After) Box & polybag wt. done as per modelwise wt. chart
202_Outflow_After.jpg
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant Packing & Dispatch section
 
12. Document Review
Documents WISOP, ProcessFlowChart, PackingStd
Specify Other Document NA
 
13. Effectiveness Of Action
Reviewed Quantity 3000
Reason for submission reviewed 3000 number found ok