QFR No - 8000802161
Defect Details
NC No. 8000802161
NC Date 29/08/2022
NC Submission Date
Part No. 520FN04002
Part Name HOLDER CLUTCH
Supplier Name & Code 100150-DHANANJAY ENTERPRISES
ETL Plant 1135-ETL 7/10 P Nagar
Defect Details DIMN.O/SIZE.-ID OVERSIZE
 
1. Problem Description
Defect Description ID OVERSIZE/UNDER SIZE ISSUE.
Detection Stage Receipt
Problem Severity Function
NG Quantity 3
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID qade@dhananjaygroup.com
Plant Head/CEO Email ID gunjalvs@dhananjaygroup.com
MD Email ID kandakuretn@dhananjaygroup.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
2000
0
0
0
0
2000
Check Qty
2000
0
0
0
0
2000
NG Qty
3
0
0
0
0
3
 
Scrap 3
Rework 0
Under Deviation 0
Containment Action
Segregate the whole lot at the ETL End/DEPL End
 
3. Process Flow
Process Flow Description
Blanking/Piercing_Deburring_Chamfering_CNC Machining_Final Inspection_Cleaning_Dispatch
 
4. Process Details
Process / Operation CNC Machining
Outsource No
Machine / Cell CNC Machining
Machine / Cell No. NA
5. Problem Analysis
Type Possible Cause Fact Verification Jud
Manin final inspection Air Plug gauge Skipped by the inspectoras final inspection (Air Plug Gauge Not done 100%) as Air Plug gauge Unit is under calibrationO
MachineIn Deburring no contribution for hole oversizeNo ContributionX
ToolIn Blanking/Piercing Premachining HoleWe have verified after blanking operation Premachining hole is okX
MethodIn Machining its chance to mix up the part (Setting Part/Rework part)Yes its having possibility to mixup the rejected parts (Setting Parts)at machine stageO
 
6. Inspection Method Analysis (Current)
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100
7. Root Cause Analysis (Occurance)
Why 1 In CNC machining ID Oversize by 0.2
Why 2 100% Air Gauge parts not checked
Why 3 Setting Part get mix up by operator
Why 4
Why 5
Root Cause (Occurance) Due to there is no Red Bin Available at machine stage so Rejected parts get mixed up
 
Root Cause Analysis (Outflow)
Why 1 As 100% Air Plug gauge Checking at Final Stage as well as Machine stage
Why 2 100% Plug gauge not Done for final inspection
Why 3 As Air gauge unit is under Calibration so that 100% inspection not done at final stage
Why 4
Why 5
Root Cause (Outflow) As Air Gauge Unit is under calibration so that 100% inspection not done at final stage
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceNow we have kept Red bin with lock and key for rejection parts (Set up /rework parts)Mr. Gaurav Nikam05/09/2022Completed
OutflowDuble Ended Plain Plug Gauge (Carbide Go) 26.020-26.041 procured as contingency of Air Gauge Unit (if Air gauge unit is under calibration so far used PPG for 100% Inspection at Final Inspection Stage)Mr. Gaurav Nikam05/09/2022Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System No
Change Details No Changed
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100
10. Evidance of Countermeasure
Occurance (Before) Due to there is no Red Bin Available at machine stage so Rejected parts get mixed up
231_Occurance_Before.xlsx
Occurance (After) Now we have kept Red bin with lock and key for rejection parts (Set up /rework parts)
231_Occurance_After.xlsx
Outflow (Before) As Air Gauge Unit is under calibration so that 100% inspection not done at final stage
231_Outflow_Before.xlsx
Outflow (After) Duble Ended Plain Plug Gauge (Carbide Go) 26.020-26.041 procured as contingency of Air Gauge Unit (if Air gauge unit is under calibration so far used PPG for 100% Inspection at Final Inspection Stage)
231_Outflow_After.xlsx
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant NA
 
12. Document Review
Documents
Specify Other Document No Any Other Documen
 
13. Effectiveness Of Action
Reviewed Quantity
Reason for submission