QFR No - 8000803123
Defect Details
NC No. 8000803123
NC Date 06/09/2022
NC Submission Date
Part No. S2HT20503B
Part Name OUTER SPRING J1A & J1D OP#2
Supplier Name & Code 101225-HELICAL SPRINGS
ETL Plant 1118-ETL E-92,93 Suspension
Defect Details DULL PLATTING-DULL PLATING OBSERVED
 
1. Problem Description
Defect Description J1A/D Outer Spring Dull Finish Observed after plating
Detection Stage Inprocess
Problem Severity Aesthetic
NG Quantity 41
Is Defect Repeatative? No
Defect Sketch / Photo ncpbku455mdtvzcmb0bisizg.png
Supplier Communication Details
Quality Head Email ID ravindra@helicalsprings.in
Plant Head/CEO Email ID shaikhmoin@helicalspeings.in
MD Email ID ataneja@helicalsprings.in
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
4000
0
0
0
2000
6000
Check Qty
4000
0
0
0
2000
6000
NG Qty
41
0
0
0
12
53
 
Scrap 53
Rework 0
Under Deviation 0
Containment Action
Check all material ETL end And Helical end
 
3. Process Flow
Process Flow Description
Raw Material Receipt & Inspection > Coiling>Stress Relieving-1>End Grinding>Shot Peening>Scragging>ID, Length & Angle checking>Stress Relieving-2>Surface Finish- Plating>Final Inspection/ PDI>Packing> Dispatch.
 
4. Process Details
Process / Operation Plating
Outsource Yes
Machine / Cell NA
Machine / Cell No. NA
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MethodDue to Excess empty time, the chemical in the nickel tank freezed causing improper Air agitationChemical in the nickel tank freezed causing improper Air agitationO
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100
7. Root Cause Analysis (Occurance)
Why 1 the chemical in the nickel tank freezed
Why 2 improper Air agitation
Why 3 Due to Excess empty time,
Why 4 --
Why 5 --
Root Cause (Occurance) Due to Excess empty time, the chemical in the nickel tank freezed causing improper Air agitation
 
Root Cause Analysis (Outflow)
Why 1 Operator not identified the dull plating
Why 2 due to the similar appearance
Why 3
Why 4
Why 5
Root Cause (Outflow) Operator not identified the dull plating due to the similar appearance
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OutflowOK & NG sample photo displayed at inspection table. Any similar deviation comparison to NG sample will also be rejectedQA01/04/202301/04/2023Completed
OccuranceAfter start of the line, air agitation checked. For Shutdown more than 3-4 days, PM will be planned .Production01/04/202301/04/2023Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System No
Change Details OK & NG sample photo displayed at inspection table
Inspection Method Other
Other Inspection Method Visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100
10. Evidance of Countermeasure
Occurance (Before) No Proper Agitation.
244_Occurance_Before.pdf
Occurance (After) Air Agitation Found Ok. During Start Of Process.
244_Occurance_After.jpg
Outflow (Before) Operator not identified the dull plating due to the similar appearance.
244_Outflow_Before.pdf
Outflow (After) OK & NG sample photo displayed at inspection table. Any similar deviation comparison to NG sample will also be rejected.
244_Outflow_After.pdf
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant Plating parts
 
12. Document Review
Documents PMCheckSheet, WISOP
Specify Other Document No
 
13. Effectiveness Of Action
Reviewed Quantity 1000
Reason for submission In Evidence of Countermeasure Occurrence Side Evidence of Before & After need to be Attach