QFR No - 8000806775
Defect Details
NC No. 8000806775
NC Date 06/10/2022
NC Submission Date
Part No. S2DP09310B
Part Name ROD LINK M14 x 1 - (H45)
Supplier Name & Code 100505-A B AUTOCOMPONENTS
ETL Plant 1118-ETL E-92,93 Suspension
Defect Details SHADE VARIATION-SHADE VARIATION
 
1. Problem Description
Defect Description Shade Variation
Detection Stage Inprocess
Problem Severity Aesthetic
NG Quantity 494
Is Defect Repeatative? No
Defect Sketch / Photo kdn3ag3veu3qenpask34ylfn.jpg
Supplier Communication Details
Quality Head Email ID headqaabauto@gmail.com
Plant Head/CEO Email ID kamalabautocomponent@gmail.com
MD Email ID abautocomponent@gmail.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
494
105
0
227
0
826
Check Qty
494
105
0
50
0
649
NG Qty
494
105
0
50
0
649
 
Scrap 494
Rework 0
Under Deviation 0
Containment Action
ETL, Ware house, AB, KARAN end Qty segregated, Q - Alert displayed at FI. Informed sub supplier. Requested ETL to provide limit sample.
 
3. Process Flow
Process Flow Description
RM received - Turning, Milling - sending to Karan for Anodizing - Anodizing at Karan - receiving at AB - FI - Dispatch.
 
4. Process Details
Process / Operation Anodizing Process at sub supplier end.
Outsource Yes
Machine / Cell Anodizing
Machine / Cell No. Anodizing
5. Problem Analysis
-------
Type Possible Cause Fact Verification Jud
 
6. Inspection Method Analysis (Current)
Inspection Method
Other Inspection Method
Check Point at Final Inspection
Checking Freq.
Sampling
Sample Size
7. Root Cause Analysis (Occurance)
Why 1
Why 2
Why 3
Why 4
Why 5
Root Cause (Occurance)
 
Root Cause Analysis (Outflow)
Why 1
Why 2
Why 3
Why 4
Why 5
Root Cause (Outflow)
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
-------
Type Countermeasure Details Responsibility Target Date Actual Date Status
 
9. Inspection Method After Customer Complaint
Change In Inspection System
Change Details
Inspection Method
Other Inspection Method
Check Point at Final Inspection
Checking Freq.
Sampling
Sample Size
10. Evidance of Countermeasure
Occurance (Before)
Occurance (After)
Outflow (Before)
Outflow (After)
 
11. Horizontal Deployment
Horizontal Deployment Required
Applicable Machine / Model / Plant
 
12. Document Review
Documents
Specify Other Document
 
13. Effectiveness Of Action
Reviewed Quantity
Reason for submission