QFR No - 8000806775
Defect Details
NC No. | 8000806775 |
NC Date | 06/10/2022 |
NC Submission Date | |
Part No. | S2DP09310B |
Part Name | ROD LINK M14 x 1 - (H45) |
Supplier Name & Code | 100505-A B AUTOCOMPONENTS |
ETL Plant | 1118-ETL E-92,93 Suspension |
Defect Details | SHADE VARIATION-SHADE VARIATION |
1. Problem Description
Defect Description | Shade Variation |
Detection Stage | Inprocess |
Problem Severity | Aesthetic |
NG Quantity | 494 |
Is Defect Repeatative? | No |
Defect Sketch / Photo | kdn3ag3veu3qenpask34ylfn.jpg |
Supplier Communication Details
Quality Head Email ID | headqaabauto@gmail.com |
Plant Head/CEO Email ID | kamalabautocomponent@gmail.com |
MD Email ID | abautocomponent@gmail.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
494
|
105
|
0
|
227
|
0
|
826
|
Check Qty |
494
|
105
|
0
|
50
|
0
|
649
|
NG Qty |
494
|
105
|
0
|
50
|
0
|
649
|
Scrap | 494 |
Rework | 0 |
Under Deviation | 0 |
Containment Action |
---|
ETL, Ware house, AB, KARAN end Qty segregated, Q - Alert displayed at FI. Informed sub supplier. Requested ETL to provide limit sample. |
3. Process Flow
Process Flow Description |
---|
RM received - Turning, Milling - sending to Karan for Anodizing - Anodizing at Karan - receiving at AB - FI - Dispatch. |
4. Process Details
Process / Operation | Anodizing Process at sub supplier end. |
Outsource | Yes |
Machine / Cell | Anodizing |
Machine / Cell No. | Anodizing |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|
6. Inspection Method Analysis (Current)
Inspection Method | |
Other Inspection Method | |
Check Point at Final Inspection | |
Checking Freq. | |
Sampling | |
Sample Size |
7. Root Cause Analysis (Occurance)
Why 1 | |
Why 2 | |
Why 3 | |
Why 4 | |
Why 5 | |
Root Cause (Occurance) |
Root Cause Analysis (Outflow)
Why 1 | |
Why 2 | |
Why 3 | |
Why 4 | |
Why 5 | |
Root Cause (Outflow) |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|
9. Inspection Method After Customer Complaint
Change In Inspection System | |
Change Details | |
Inspection Method | |
Other Inspection Method | |
Check Point at Final Inspection | |
Checking Freq. | |
Sampling | |
Sample Size |
10. Evidance of Countermeasure
Occurance (Before) |
|
Occurance (After) |
|
Outflow (Before) |
|
Outflow (After) |
|
11. Horizontal Deployment
Horizontal Deployment Required | |
Applicable Machine / Model / Plant |
12. Document Review
Documents | |
Specify Other Document |
13. Effectiveness Of Action
Reviewed Quantity | |
Reason for submission |