QFR No - 8000807947
Defect Details
NC No. | 8000807947 |
NC Date | 17/10/2022 |
NC Submission Date | |
Part No. | S2BG02502B |
Part Name | BRACKET UN P/C KTEP |
Supplier Name & Code | 100973-TESMO MOTORCAST PRIVATE LIMITE |
ETL Plant | 1116-ETL K-120 Suspension |
Defect Details | THREADING NOT OK-THREADING NOT OK |
1. Problem Description
Defect Description | Bracket KTEP observed with threading not ok concern. In every month major qty. rejected for same. |
Detection Stage | Receipt |
Problem Severity | Fitment |
NG Quantity | 967 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | rkhare@tesmomotorcast.com |
Plant Head/CEO Email ID | harish.bala@tesmomotorcast.com |
MD Email ID | svkallani@tesmomotorcast.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
767
|
0
|
0
|
0
|
0
|
767
|
Check Qty |
767
|
0
|
0
|
0
|
0
|
767
|
NG Qty |
767
|
0
|
0
|
0
|
0
|
767
|
Scrap | 500 |
Rework | 100 |
Under Deviation | 67 |
Containment Action |
---|
core pin bend issuse |
3. Process Flow
Process Flow Description |
---|
pdc , debering ,remer , vibro ,chamfer ,taping , air claning ,pack |
4. Process Details
Process / Operation | pdc,debering ,remer ,vibro ,chamfer ,taping |
Outsource | No |
Machine / Cell | pdc |
Machine / Cell No. | pdc 250 1 |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Tool | core pin bend | Gauge | O |
Material | core pin hardness not ok | hardness testing report check | O |
6. Inspection Method Analysis (Current)
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | every hrs |
7. Root Cause Analysis (Occurance)
Why 1 | Tap not gone up to required depth |
Why 2 | Tap jam while completing its cycle |
Why 3 | Hole pin perpendicularity not ok |
Why 4 | Die core pin bend |
Why 5 | Pin hardness not as per requirement |
Root Cause (Occurance) | Core pin hardness not freeze. |
Root Cause Analysis (Outflow)
Why 1 | Tap not gone up to required depth |
Why 2 | Tap jam while completing its cycle |
Why 3 | Hole pin perpendicularity not ok |
Why 4 | Die core pin perpendicularity not ok |
Why 5 | Perpendicularity not check |
Root Cause (Outflow) | Core pin Perpendicularity checking frequency not defined. |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Outflow | hourly pin hole perpendicularity checking | Rahul | 06/07/2023 | 25/06/2023 | Completed |
Occurance | Pin hardness freeze | Ravi | 10/07/2023 | 26/06/2023 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | Perpendicularity checking started on hourly check on PDC |
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | 1000 |
10. Evidance of Countermeasure
Occurance (Before) |
Core pin bend 290_Occurance_Before.jpg |
Occurance (After) |
Due to the pin bend, taping was not done untill the end. 290_Occurance_After.jpg |
Outflow (Before) |
Guaege install 290_Outflow_Before.jpg |
Outflow (After) |
Guaege checking strat 290_Outflow_After.jpg |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | Pdc 250 t 1 KTEP Bracket |
12. Document Review
Documents | JHCheckSheet, InspCheckSheet |
Specify Other Document | Pm check sheet, Ins |
13. Effectiveness Of Action
Reviewed Quantity | |
Reason for submission |