QFR No - 8000808350
Defect Details
NC No. | 8000808350 |
NC Date | 18/10/2022 |
NC Submission Date | |
Part No. | 013AQ00123 |
Part Name | BASE VALVE CASE GROOVED |
Supplier Name & Code | 100177-SPECIALITY SINTERED PRODUCTS P |
ETL Plant | 1116-ETL K-120 Suspension |
Defect Details | NOT AS PER SPECIFICATION-OPRATION MISSING |
1. Problem Description
Defect Description | Groove operation missing concern repetitively observed. |
Detection Stage | Inprocess |
Problem Severity | Fitment |
NG Quantity | 8 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | ganeshpadwalkar@specialitysintered.com |
Plant Head/CEO Email ID | sandeep.gaikwad@ssplpune.com |
MD Email ID | lalit.chaudhari@ssplpune.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
20000
|
30000
|
0
|
15000
|
12000
|
77000
|
Check Qty |
19994
|
30000
|
0
|
15000
|
12000
|
76994
|
NG Qty |
6
|
0
|
0
|
0
|
0
|
6
|
Scrap | 6 |
Rework | 0 |
Under Deviation | 0 |
Containment Action |
---|
SSPL representative visited to ETL for ICA at ETL End and Warehouse |
3. Process Flow
Process Flow Description |
---|
Raw material inspection & Mixing - Forming - Sintering - Debarring - Steam - machining - Final Inspection - Oiling - Packagining - Dispatch |
4. Process Details
Process / Operation | Machining |
Outsource | Yes |
Machine / Cell | Traun No 10 |
Machine / Cell No. | Traub section |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Man | Unskill Operator | Level 4 Operator At Machine . | X |
Method | Input & Material Handling Not Ok | Verified No seprate Provision Provided To Unlodade Output Material. | O |
Tool | Wrong Tool Used | Tool Verified Found Ok | X |
Material | Wrong Raw Material | Material Checked As Per TC Found Ok | X |
Machine | Machine Not Working Properly | Verified Found Ok | X |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | Visual |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | As Per Sam |
7. Root Cause Analysis (Occurance)
Why 1 | Without Machining Part Found At Customer End .. |
Why 2 | During Machining process Machine Input Material Mixed With Output Material. . |
Why 3 | No seprate Provision Provided To Unlodade Output Material. |
Why 4 | No Poke Yoka . |
Why 5 | |
Root Cause (Occurance) | No Poke Yoka . |
Root Cause Analysis (Outflow)
Why 1 | Without Machining Part Found At Customer End . |
Why 2 | Deffective part Pass from Final Inspection . |
Why 3 | Rejected parts Mixed With Ok Parts . |
Why 4 | Lock And Key Rejection Bin Not Available At Final Inspection Table . |
Why 5 | |
Root Cause (Outflow) | Lock And Key Rejection Bin Not Available At Final Inspection Table . |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Outflow | Lock And Key For Rejection Material Provision Given To Inspection Table . | MR Sunil | 20/10/2022 | 21/10/2022 | Completed |
Occurance | Seprate Provision Provided To Unloaded Output material . | Mr Mahesh Narkhede | 25/10/2022 | 27/10/2022 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | Lock And Key For Rejection Material Provision Given To Inspection Table . |
Inspection Method | Other |
Other Inspection Method | Visual Inspection |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 100% |
10. Evidance of Countermeasure
Occurance (Before) |
No Separate Provision Provided To Unloaded Output material . 291_Occurance_Before.xlsx |
Occurance (After) |
Separate Provision Provided To Unloaded Output material . 291_Occurance_After.xlsx |
Outflow (Before) |
Lock And Key Provision Not Available For Rejected Material At Inspection Table 291_Outflow_Before.xlsx |
Outflow (After) |
Lock And Key Provision Given For Rejected Material At Inspection Table . 291_Outflow_After.xlsx |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | - |
12. Document Review
Documents | InspCheckSheet |
Specify Other Document | Quality Alert . |
13. Effectiveness Of Action
Reviewed Quantity | 1200 |
Reason for submission | Completed. |