QFR No - 8000817429
Defect Details
NC No. | 8000817429 |
NC Date | 18/01/2023 |
NC Submission Date | |
Part No. | F2DZ09002B |
Part Name | FORK BOLT -K17E |
Supplier Name & Code | 101263-SINGLA PRECISION SCREWS |
ETL Plant | 1117-ETL K-228/9 Suspension |
Defect Details | NOT AS PER SPECIFICATION-M26 GAUGE AND MATING PART NOT QUALIFY |
1. Problem Description
Defect Description | fork bolt threads not qualify to mating part- threads found damage marks |
Detection Stage | Inprocess |
Problem Severity | Fitment |
NG Quantity | 240 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | quality@singlaprecision.com |
Plant Head/CEO Email ID | quality@singlaprecision.com |
MD Email ID | aditya@singlaprecision.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
1600
|
0
|
0
|
0
|
0
|
1600
|
Check Qty |
1600
|
0
|
0
|
0
|
0
|
1600
|
NG Qty |
810
|
0
|
0
|
0
|
0
|
810
|
Scrap | 0 |
Rework | 810 |
Under Deviation | 0 |
Containment Action |
---|
100 % MATING PART INSPECTION DONE AT ALL THE MATERIAL LYING AT VARIOUS STAGES. |
3. Process Flow
Process Flow Description |
---|
1. RM 2. PART OFF 3. PUNCHING 4. DRILLING+COUNTER 5. TAPPING 6. CNC TURNING 7. FINAL INSPECTION 8. PACKING AND DISPATCH (ROHTAK TO AURANGABAD) 8. SURFACE TREATMENT 9. FINAL SORTING 10. PACKING AND DISPATCH (WAREHOUSE TO ETL) |
4. Process Details
Process / Operation | TRANSPORTATION (ROHTAK TO AURANGABAD) |
Outsource | No |
Machine / Cell | TRANSPORTATION |
Machine / Cell No. | TRANSPORTATION |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Method | INSPECTION PLAN NOT EFFECTIVE | VALIDATED AND FOUND OK | X |
Tool | ROLLING DIE WEAR | VALIDATED AND FOUND OK | X |
Machine | NUT BOLTS MAY LOOSE | VALIDATED AND FOUND OK | X |
Man | MISHANDLING OF MATERIAL | DURING TRANSPORTATION THREAD OF PART WAS NOT PROPERLY COVERED AND THREAD GOT DAMAGE OF SOME PIECES | O |
Material | RM SIZE AND GRADE NOT OK | VALIDATED AND FOUND OK | X |
6. Inspection Method Analysis (Current)
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | ACC PLAN |
7. Root Cause Analysis (Occurance)
Why 1 | M26 THREAD NOT OK. |
Why 2 | DURING TRANSPORTATION FROM ROHTAK TO WAREHOUSE THREAD GOT DAMAGE. |
Why 3 | THREAD WERE NOT PROPERLY COVERED IN PACKING. |
Why 4 | SO THREAD GOT DAMAGE. |
Why 5 | |
Root Cause (Occurance) | DURING TRANSPORTATION FROM ROHTAK TO WAREHOUSE THREAD GOT DAMAGE.THREAD WERE NOT PROPERLY COVERED IN PACKING.SO THREAD GOT DAMAGE. |
Root Cause Analysis (Outflow)
Why 1 | M26 THREAD NOT OK |
Why 2 | TRANSPORT FACILITY WAS FIRST SHARED WITH OTHER COMPANIES. |
Why 3 | DURING TRANSPORTATION HANDLING OF MATERIAL WAS NOT EFFECTIVE . |
Why 4 | SO NG PART DISPATCHED TO CUSTOMER. |
Why 5 | |
Root Cause (Outflow) | TRANSPORT FACILITY WAS FIRST SHARED WITH OTHER COMPANIES.DURING TRANSPORTATION HANDLING OF MATERIAL WAS NOT EFFECTIVE .SO NG PART DISPATCHED TO CUSTOMER. |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Outflow | TRANSPORTATION FACILITY CHANGED. NOW OUR MATERIAL WILL BE DISPATCHED DIRECTLY FROM ROHTAK TO WAREHOUSE WITH SINGLE TRANSPORT TO AVOID THE MISHANDLING OF MATERIAL. | GANESH MAURYA | 30/01/2023 | 31/01/2023 | Completed |
Occurance | THREADS WERE PROPERLY COVERED WITH CAP AND PROPER BOX USED FOR PACKING TO AVOID THE CONTACT OF MATERIAL WITH EACH OTHER | GANESH MAURYA | 30/01/2023 | 31/01/2023 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | No |
Change Details | NO CHANGE |
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | ACC. PLAN |
10. Evidance of Countermeasure
Occurance (Before) |
THREAD WERE NOT COVERED IN PACKING 338_Occurance_Before.pdf |
Occurance (After) |
THREADS WERE COVERED PROPERLY WITH CAP 338_Occurance_After.pdf |
Outflow (Before) |
TRANSPORTATION MATERIAL HANDLING WAS NOT EFFECTIVE 338_Outflow_Before.pdf |
Outflow (After) |
TRANSPORT FACILITY CHANGED. 338_Outflow_After.pdf |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | ALL FORK BOLTS |
12. Document Review
Documents | PackingStd |
Specify Other Document | NO |
13. Effectiveness Of Action
Reviewed Quantity | 300 |
Reason for submission | Next lot verified and found ok |