QFR No - 8000820612
Defect Details
NC No. 8000820612
NC Date 15/02/2023
NC Submission Date
Part No. S3HT00307B
Part Name OUTER SPRING POWDER COATED-TVS KING RR
Supplier Name & Code 101225-HELICAL SPRINGS
ETL Plant 1116-ETL K-120 Suspension
Defect Details LENGTH OVERSIZE-LENGTH OVERSIZE
 
1. Problem Description
Defect Description Total length oversize concern observed. Length oversize by 2 to 3 mm.
Detection Stage Receipt
Problem Severity Fitment
NG Quantity 295
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID ravindra@helicalsprings.in
Plant Head/CEO Email ID shaikhmoin@helicalsprings.in
MD Email ID ataneja@helicalsprings.in
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
410
0
0
0
300
710
Check Qty
410
0
0
0
300
710
NG Qty
295
0
0
0
300
595
 
Scrap 0
Rework 295
Under Deviation 0
Containment Action
All pipeline material at ETL & Helical end checked for length over size defect.Ok material given for next stage.
 
3. Process Flow
Process Flow Description
Raw Material Receipt & Inspection> Coiling > Stress Relieving > End Grinding > Shot Peening > Scragging > ID, Length & Angle checking > Surface Finish- Powder Coating > Final Inspection> Packing > Dispatch
 
4. Process Details
Process / Operation ID & Length checking
Outsource No
Machine / Cell Spring Line
Machine / Cell No. N/A
5. Problem Analysis
Type Possible Cause Fact Verification Jud
ManNo Manpower ChangeData VerifiedO
ToolNo Tooling ChangeTooling Sheet Checked Found OkO
MethodReworked Material Mix In Ok MaterialOnly One Yellow Bin Used.X
MaterialNo Material ChangeData Checked Found OkO
MachineNo Machine ChangeNo Machine ChangeO
 
6. Inspection Method Analysis (Current)
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
7. Root Cause Analysis (Occurance)
Why 1 Length Oversize Observed At Customer End.
Why 2 Length Oversize Sampling Mix With Ok Lot.
Why 3 Length Oversize Material Kept in Green Bin
Why 4 Yellow Bin At Use Was Only 1
Why 5 No Extra Yellow Bin Used By Operator For More Qty Of RW
Root Cause (Occurance) No Extra Yellow Bin Used By Operator For More Qty Of RW
 
Root Cause Analysis (Outflow)
Why 1 Length Oversize Observed At Customer End.
Why 2 Mix Up Of RW Samples Occurred After 100% Sampling.
Why 3 -
Why 4 -
Why 5 -
Root Cause (Outflow) Mix Up Of RW Samples Occurred After 100% Sampling.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OutflowOPL Displayed For Usage Of Yellow Bins only For RW. Training Provided.Prod.28/02/202328/02/2023Completed
OccuranceOPL Displayed For Usage Of Yellow Bins Only For RW.Prod.28/02/202328/02/2023Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System No
Change Details No Changes in Inspection System
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
10. Evidance of Countermeasure
Occurance (Before) Operator Used Green Bins To Keep Extra RW Material
363_Occurance_Before.pdf
Occurance (After) OPL Displayed For Using Only Yellow Bins For RW Material.
363_Occurance_After.pdf
Outflow (Before) Operator Used Green Bins To Keep Extra RW Material
363_Outflow_Before.pdf
Outflow (After) Training Provided To Operators.
363_Outflow_After.pdf
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant All Items
 
12. Document Review
Documents WISOP, ProcessFlowChart
Specify Other Document OPL & Training Sheet
 
13. Effectiveness Of Action
Reviewed Quantity 10
Reason for submission Corrective action parts submission.