QFR No - 8000826277
Defect Details
NC No. 8000826277
NC Date 14/04/2023
NC Submission Date
Part No. S2HT11707B
Part Name OUTER SPRING POWDER COATED
Supplier Name & Code 101225-HELICAL SPRINGS
ETL Plant 1118-ETL E-92,93 Suspension
Defect Details BEND-BEND
 
1. Problem Description
Defect Description Taper Coil Observed Bend
Detection Stage Inprocess
Problem Severity Fitment
NG Quantity 264
Is Defect Repeatative? No
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID amitpatel.24@rediffmail.com
Plant Head/CEO Email ID shaikhmoin@helicalsprings.in
MD Email ID ataneja@helicalsprings.in
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
14160
0
0
0
300
14460
Check Qty
14160
0
0
0
300
14460
NG Qty
395
0
0
0
0
395
 
Scrap 395
Rework 0
Under Deviation 0
Containment Action
100% Segregation done
 
3. Process Flow
Process Flow Description
As per PFD
 
4. Process Details
Process / Operation Coling
Outsource No
Machine / Cell --
Machine / Cell No. --
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MethodNo concentricity check at coilingNo method to check concentricity at coilingO
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method VIsual
Check Point at Final Inspection No
Checking Freq. 100%
Sampling No
Sample Size 100
7. Root Cause Analysis (Occurance)
Why 1 Spring bend at small ID side
Why 2 Taper coil at small ID shift
Why 3 Concentricity of spring ID not Ok
Why 4 Concentricity approved by visual Check
Why 5 No Concentricity Gauge Defined at coiling
Root Cause (Occurance) No Concentricity Gauge Defined at coiling
 
Root Cause Analysis (Outflow)
Why 1 Bend Spring Not arrested in inspection
Why 2 No Check point of Spring Concentricity.
Why 3
Why 4
Why 5
Root Cause (Outflow) No Check point of Spring Concentricity.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OutflowConcentricity Checking Gauge during Dock AuditAP14/04/202314/04/2023Completed
OccuranceConcentricity Checking Gauge introduced at coilingNK14/04/202317/04/2023Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Concentricity Checking Gauge during Dock Audit
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 5
10. Evidance of Countermeasure
Occurance (Before) No Gauge introduced before
412_Occurance_Before.pdf
Occurance (After) Concentricity gauge Introduced
412_Occurance_After.pdf
Outflow (Before) No Gauge introduced before
412_Outflow_Before.pdf
Outflow (After) Concentricity gauge Introduced
412_Outflow_After.pdf
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant K1 Old
 
12. Document Review
Documents PFMEA, WISOP, InspCheckSheet
Specify Other Document OPL
 
13. Effectiveness Of Action
Reviewed Quantity 1000
Reason for submission No Defect Reported after Action