QFR No - 8000827286
Defect Details
NC No. 8000827286
NC Date 24/04/2023
NC Submission Date
Part No. 520HL00202
Part Name OIL LOCK COLLAR
Supplier Name & Code 100097-MAHAVIR INDUSTRIES
ETL Plant 1146-ETL Suspension Narasapura
Defect Details LENGTH UNDERSIZE-TOTAL LENGHT LESS
 
1. Problem Description
Defect Description Oil lock collar total length less issue
Detection Stage Inprocess
Problem Severity Fitment
NG Quantity 10
Is Defect Repeatative? No
Defect Sketch / Photo e01cj5hc5pkgorczc3ywsn10.xlsx
Supplier Communication Details
Quality Head Email ID quality@mahavirind.co.in
Plant Head/CEO Email ID production@mahavirind.co.in
MD Email ID rajesh@mahavirind.co.in
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
3000
0
0
1800
0
4800
Check Qty
3000
0
0
0
0
3000
NG Qty
10
0
0
0
0
10
 
Scrap 10
Rework 0
Under Deviation 0
Containment Action
All material Customer End and Mahavir Ind. RFD Material verified.
 
3. Process Flow
Process Flow Description
RM Inward- store- Traub parting- OD Grinding - Plating - Final Inspection- Packing -Transport
 
4. Process Details
Process / Operation Traub parting
Outsource Yes
Machine / Cell Traub Cutting
Machine / Cell No. Traub No.2
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MachineBend PipeBend Pipe not Movement as per Required Length due to Balance Weight Improper.X
 
6. Inspection Method Analysis (Current)
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 100
7. Root Cause Analysis (Occurance)
Why 1 Length Under Size
Why 2 Bend Pipe Not movement during the parting Process on Traub machine
Why 3 Weight Balancing Not enough.
Why 4
Why 5
Root Cause (Occurance) Weight Balancing Not enough.
 
Root Cause Analysis (Outflow)
Why 1 Length Under Size
Why 2 Defected material skipped by Inspector During Final inspection
Why 3 Final Inspection sampling frequency low
Why 4
Why 5
Root Cause (Outflow) Final Inspection sampling frequency low
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceRequired Balancing weight Increase for bend pipe movement.Mr.Suresh Kapgate/ Mr. Pralhad Bhawar27/04/2023Pending
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details 1) Sampling Size Increase .2) Length Gauge Provide On Traub Machine .
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 100%
10. Evidance of Countermeasure
Occurance (Before) Parting Pipe Not proper movement On Traub Due to Weight Balancing Improper
424_Occurance_Before.xlsx
Occurance (After) As per Required Balancing Weight Increase for bend pipe Parting
424_Occurance_After.xlsx
Outflow (Before) Length gauge not available on Traub Machine.
424_Outflow_Before.xlsx
Outflow (After) Length gauge Provide On Parting Process Traub Machine
424_Outflow_After.xlsx
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant For All Oil lock collars Weight Balancer Increase
 
12. Document Review
Documents ControlPlan, PFMEA
Specify Other Document no
 
13. Effectiveness Of Action
Reviewed Quantity
Reason for submission