QFR No - 8000827791
Defect Details
NC No. 8000827791
NC Date 28/04/2023
NC Submission Date
Part No. F2PH00902B
Part Name VALVE RETAINER (C101B)
Supplier Name & Code 101255-MAHAVIR INDUSTRIES
ETL Plant 1146-ETL Suspension Narasapura
Defect Details RUSTY-RUST ISSUE
 
1. Problem Description
Defect Description valve retainer rust issue
Detection Stage Receipt
Problem Severity Aesthetic
NG Quantity 1000
Is Defect Repeatative? No
Defect Sketch / Photo hu2g3xnwwdoxzi2mq5cqmlnm.jpg
Supplier Communication Details
Quality Head Email ID quality@mahavirind.co.in
Plant Head/CEO Email ID production@mahavirind.co.in
MD Email ID
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
6000
6000
0
0
0
12000
Check Qty
6000
6000
0
0
0
12000
NG Qty
1000
0
0
0
0
1000
 
Scrap 1000
Rework 0
Under Deviation 0
Containment Action
All Material Check at the Customer End and Warehouse End.
 
3. Process Flow
Process Flow Description
RM inward - store - Parting - Semi finish Inward - CNC ( Counter ID Machining ) - OD Grinding- Plating - Final Inspection - Packing - Dispatch - Transport- warehouse- Customer Received
 
4. Process Details
Process / Operation Warehouse Loading - Unloading Handling Problem
Outsource No
Machine / Cell Narsapura Warehouse
Machine / Cell No. Narsapura Warehouse
5. Problem Analysis
-------
Type Possible Cause Fact Verification Jud
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
7. Root Cause Analysis (Occurance)
Why 1 Rusty
Why 2 Finish Good Material Wet at warehouse
Why 3 Finish Good Lying On Shop floor
Why 4 Packing Bag Torn of finish good
Why 5 Improper Material Handling
Root Cause (Occurance) Packing Bag Torn of finish good
 
Root Cause Analysis (Outflow)
Why 1 Rusty
Why 2 Finish Good Material More No. of days lying at transport Godown
Why 3 Inform To godown person
Why 4
Why 5
Root Cause (Outflow) Finish Good Material More No. of days lying at transport Godown
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
Occurance1)Improper Material Handling .2)Finish Good Material More No. of days lying at transport GodownMahavir QA10/05/202310/05/2023Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details 1)Packing as per Customer Standards. 2) HDPE white, Heavy thickness and clean Gunny bags use for outer coating packing.
Inspection Method Other
Other Inspection Method Packing Visual Obs
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100
10. Evidance of Countermeasure
Occurance (Before) 1)Finish Good Packing Bag Torn at warehouse during Material Handling . 2)Low Thickness Poly Bag.
443_Occurance_Before.xlsx
Occurance (After) 1)Inner poly bag thickness increases up to 400 gauge Instead of 300 Gauge for Tearing problems avoid Suitable to Material Handling. 2)HDPE white , Heavy thickness and clean Gunny bags use for outer coating packing.
443_Occurance_After.xlsx
Outflow (Before) Finish Good Material More No. of days lying at transport godown
443_Outflow_Before.jpg
Outflow (After) As per the attached packing standard
443_Outflow_After.xlsx
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant Applicable all Narsapur-supplied Parts
 
12. Document Review
Documents PackingStd
Specify Other Document No
 
13. Effectiveness Of Action
Reviewed Quantity 1000
Reason for submission Reviewed 1000 no`s found ok