QFR No - 8000828496
Defect Details
NC No. | 8000828496 |
NC Date | 09/05/2023 |
NC Submission Date | |
Part No. | F2GN22102B |
Part Name | MAIN SPRING - J1C2 FF |
Supplier Name & Code | 101225-HELICAL SPRINGS |
ETL Plant | 1117-ETL K-228/9 Suspension |
Defect Details | NOT AS PER SPECIFICATION-OVERALL LENGTH OVERSIZE |
1. Problem Description
Defect Description | Overall length found oversize by 7 mm. |
Detection Stage | Receipt |
Problem Severity | Fitment |
NG Quantity | 143 |
Is Defect Repeatative? | No |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | amit.patel@helicalsprings.com |
Plant Head/CEO Email ID | shaikhmoin@helicalsprings.in |
MD Email ID | ataneja@helicalsprings.in |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
3000
|
0
|
0
|
5000
|
0
|
8000
|
Check Qty |
3000
|
0
|
0
|
5000
|
0
|
8000
|
NG Qty |
143
|
0
|
0
|
0
|
0
|
143
|
Scrap | 0 |
Rework | 143 |
Under Deviation | 0 |
Containment Action |
---|
Segregation of Total stock completed |
3. Process Flow
Process Flow Description |
---|
RM receipt - Coiling- SR1-Grinding- Shot peening- scragging- 100% length checking- SR2-oiling-PDI |
4. Process Details
Process / Operation | 100% Checking |
Outsource | No |
Machine / Cell | Length Checking |
Machine / Cell No. | 1 |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Method | Rework sample mix | only one yellow bin used | O |
6. Inspection Method Analysis (Current)
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | 5/lot |
7. Root Cause Analysis (Occurance)
Why 1 | Length oversize observed at customer end |
Why 2 | Length oversize sample mix with Ok lot |
Why 3 | length Oversize material kept in green bin |
Why 4 | yellow bin at use was only 1 |
Why 5 | No extra yellow bin used by operator for more qty of RW |
Root Cause (Occurance) | No extra yellow bin used by operator for more qty of RW |
Root Cause Analysis (Outflow)
Why 1 | Length oversize observed at customer end |
Why 2 | Mix up of RW samples occurred after 100% sorting |
Why 3 | - |
Why 4 | - |
Why 5 | - |
Root Cause (Outflow) | Mix up of RW samples occurred after 100% sorting |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Occurance | OPL displayed for usage of yellow bins only for RW | Prod | 29/04/2023 | 29/04/2023 | Completed |
Outflow | OPL displayed for usage of yellow bins only for RW. Training provided | Prod | 29/04/2023 | 29/04/2023 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | No |
Change Details | no |
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 100 |
10. Evidance of Countermeasure
Occurance (Before) |
Operator used Green bin to keep extra RW material 446_Occurance_Before.pdf |
Occurance (After) |
OPL displayed for using only Yellow bin 446_Occurance_After.pdf |
Outflow (Before) |
Operator used Green bin to keep extra RW material 446_Outflow_Before.pdf |
Outflow (After) |
Training Provided to operator 446_Outflow_After.jpg |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | All Items |
12. Document Review
Documents | AuditCheckSheet |
Specify Other Document | OPL |
13. Effectiveness Of Action
Reviewed Quantity | 300 |
Reason for submission | ok |