QFR No - 8000831090
Defect Details
NC No. 8000831090
NC Date 31/05/2023
NC Submission Date
Part No. B2FP01013O
Part Name HOLDER BRACKET FINISHED - REML
Supplier Name & Code 100398-MANOJ INDUSTRIES
ETL Plant 1120-ETL K-226/2 Disc Brakes
Defect Details DAMAGES-AFTER 100% INSP. BH,PINHOLES,DENT,DAMAGE
 
1. Problem Description
Defect Description Dent, & Blow holes observed on parts
Detection Stage Receipt
Problem Severity Aesthetic
NG Quantity 25
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID qad@manojindustrieskop.com
Plant Head/CEO Email ID foundry@manojindustrieskop.com
MD Email ID mgnt@manojindustrieskop.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
1750
450
0
500
0
2700
Check Qty
1750
450
0
500
0
2700
NG Qty
18
13
0
7
0
38
 
Scrap 38
Rework 0
Under Deviation 0
Containment Action
100% visual Inspection of All pipeline stock
 
3. Process Flow
Process Flow Description
casting ,VMC machining ,Slotting ,Final Inspection
 
4. Process Details
Process / Operation casting ,VMC machining
Outsource No
Machine / Cell ENDURANCE CELL
Machine / Cell No. VMC-14
5. Problem Analysis
-------
Type Possible Cause Fact Verification Jud
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method visual Inspection
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
7. Root Cause Analysis (Occurance)
Why 1 Dent damage observed on casting
Why 2 Casting dent observed at parting process
Why 3 After parting parts not kept properly
Why 4 operator keeps the parts in open bin from 2ft height
Why 5
Root Cause (Occurance) operator keeps the parts in open bin from 2ft height
 
Root Cause Analysis (Outflow)
Why 1 Dent damage observed on casting
Why 2 skipped from final inspector
Why 3
Why 4
Why 5
Root Cause (Outflow) skipped from final inspector
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
-------
Type Countermeasure Details Responsibility Target Date Actual Date Status
 
9. Inspection Method After Customer Complaint
Change In Inspection System No
Change Details No
Inspection Method Other
Other Inspection Method Visual Inspection
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
10. Evidance of Countermeasure
Occurance (Before) After parting operation parts kept in open bin
456_Occurance_Before.png
Occurance (After) After parting parts kept in partitioned bin
456_Occurance_After.jpg
Outflow (Before) no Dot mark provided
456_Outflow_Before.jpg
Outflow (After) Dot mark provided
456_Outflow_After.jpg
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant Master cylinder,Calipers
 
12. Document Review
Documents WISOP
Specify Other Document Quality plan
 
13. Effectiveness Of Action
Reviewed Quantity 100
Reason for submission NO damage observed in corrected lot