QFR No - 8000839290
Defect Details
NC No. 8000839290
NC Date 02/08/2023
NC Submission Date
Part No. F2BF26416M
Part Name OUTER TUBE BUFF LH K0NA DRUM
Supplier Name & Code 100001-ANANT ENTERPRISES
ETL Plant 1146-ETL Suspension Narasapura
Defect Details BUFFING DEFECT-BUFFING STEP MARK
 
1. Problem Description
Defect Description buffing step mark issue
Detection Stage Inprocess
Problem Severity Aesthetic
NG Quantity 40
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID anandkulkarni@anantgroup.co.in
Plant Head/CEO Email ID pramodgosavi@anantgroup.co.in
MD Email ID ashwinjoshi@anantgroup.co.in
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
0
0
0
500
500
1000
Check Qty
0
0
0
500
500
1000
NG Qty
0
0
0
20
20
40
 
Scrap 0
Rework 20
Under Deviation 0
Containment Action
100 % dot identification mark on part
 
3. Process Flow
Process Flow Description
buffing stage op -50
 
4. Process Details
Process / Operation buffing stage op -50
Outsource No
Machine / Cell buffing stage op -50
Machine / Cell No. buffing stage op -50
5. Problem Analysis
Type Possible Cause Fact Verification Jud
Mansemi skill oparetorvisualO
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size NA
7. Root Cause Analysis (Occurance)
Why 1
Why 2
Why 3
Why 4
Why 5
Root Cause (Occurance)
 
Root Cause Analysis (Outflow)
Why 1
Why 2
Why 3
Why 4
Why 5
Root Cause (Outflow)
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
-------
Type Countermeasure Details Responsibility Target Date Actual Date Status
 
9. Inspection Method After Customer Complaint
Change In Inspection System
Change Details
Inspection Method
Other Inspection Method
Check Point at Final Inspection
Checking Freq.
Sampling
Sample Size
10. Evidance of Countermeasure
Occurance (Before)
Occurance (After)
Outflow (Before)
Outflow (After)
 
11. Horizontal Deployment
Horizontal Deployment Required
Applicable Machine / Model / Plant
 
12. Document Review
Documents
Specify Other Document
 
13. Effectiveness Of Action
Reviewed Quantity
Reason for submission