Defect Details
NC No. 8000843595
NC Date 07/09/2023
NC Submission Date
Part No. B2GQ01903O
Part Name MASTER CYLINDER RAW CASTING- C101 H
Supplier Name & Code 100398-MANOJ INDUSTRIES
ETL Plant 1120-ETL K-226/2 Disc Brakes
Defect Details BLOW HOLES-LEAKAGE AT CUSTOMER END
 
1. Problem Description
Defect Description Leakage
Detection Stage Customer End
Problem Severity Safety
NG Quantity 1
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID qad@manojindustrieskop.com
Plant Head/CEO Email ID foundry@manojindustrieskop.com
MD Email ID mgnt@manojindustrieskop.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
1300
0
0
0
0
1300
Check Qty
1300
0
0
0
0
1300
NG Qty
1
0
0
0
0
1
 
Scrap 1
Rework 0
Under Deviation 0
Containment Action
----
 
3. Process Flow
Process Flow Description
Casting production
 
4. Process Details
Process / Operation Casting production
Outsource No
Machine / Cell MI Tilt -19
Machine / Cell No. MI Tilt -19
5. Problem Analysis
-------
Type Possible Cause Fact Verification Jud
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method Die modification
Check Point at Final Inspection No
Checking Freq. 100%
Sampling No
Sample Size 100%
7. Root Cause Analysis (Occurance)
Why 1 Leakage observed at customer end.
Why 2 Shrinkage porosity observed at below barrel OD at corner radius
Why 3 Improper feeding of material at barrel OD area
Why 4 Due to cross sectional variation shrinkage porosity observed.
Why 5
Root Cause (Occurance) Due to cross sectional variation shrinkage porosity observed.
 
Root Cause Analysis (Outflow)
Why 1 Leakage observed at customer end.
Why 2 Defect not seen by nacked eyes
Why 3
Why 4
Why 5
Root Cause (Outflow) ---
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceWe are adding extra feeder as per proposed action it will help to feed the casting below lug areaD B LAD21/09/202329/09/2023Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System No
Change Details no change
Inspection Method Other
Other Inspection Method DP test done
Check Point at Final Inspection No
Checking Freq. Sampling
Sampling No
Sample Size daily
10. Evidance of Countermeasure
Occurance (Before) Leakage observed at bellow lug area
542_Occurance_Before.png
Occurance (After) We are adding extra feeder as per proposed action it will help to feed the casting below lug area
542_Occurance_After.png
Outflow (Before) Leakage observed at bellow lug area
542_Outflow_Before.png
Outflow (After) ---
542_Outflow_After.png
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant All C101 master cyl
 
12. Document Review
Documents
Specify Other Document no
 
13. Effectiveness Of Action
Reviewed Quantity 500
Reason for submission NO leakage found in received lot