QFR No - 8000848572
Defect Details
NC No. | 8000848572 |
NC Date | 13/10/2023 |
NC Submission Date | |
Part No. | B2SU01102O |
Part Name | ETL ABS MTG BKT PLATINA B106J(SILVER) |
Supplier Name & Code | 100144-AURANGABAD PRESSINGS |
ETL Plant | 1120-ETL K-226/2 Disc Brakes |
Defect Details | FLATNESS NOT OK.-FLATNESS NOT OK |
1. Problem Description
Defect Description | FLATNESS NOT OK.-FLATNESS NOT OK |
Detection Stage | Inprocess |
Problem Severity | Fitment |
NG Quantity | 63 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | quality@apw3.co.in |
Plant Head/CEO Email ID | aurangabadpressings@apw3.co.in |
MD Email ID | shashikant@apw3.co.in |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
800
|
0
|
0
|
200
|
500
|
1500
|
Check Qty |
800
|
0
|
0
|
200
|
500
|
1500
|
NG Qty |
63
|
0
|
0
|
0
|
0
|
63
|
Scrap | 20 |
Rework | 43 |
Under Deviation | 0 |
Containment Action |
---|
flatting Tool Die & punch reshaping |
3. Process Flow
Process Flow Description |
---|
Blanking-Piercing -logo - 1St forming -2 nd forming-flattening |
4. Process Details
Process / Operation | flattning |
Outsource | No |
Machine / Cell | machine No 10 |
Machine / Cell No. | press shop |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Method | Inspection method change | Inspection for flatness 5 nos component every Bin before dispatch | O |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | surface plate |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | 5 nos |
7. Root Cause Analysis (Occurance)
Why 1 | Gap between bracket & modular |
Why 2 | Flatness not ok |
Why 3 | Punch Pressure not applied on bracket total area |
Why 4 | |
Why 5 | |
Root Cause (Occurance) | Punch & die plate surface uneven |
Root Cause Analysis (Outflow)
Why 1 | Gap between bracket & modular |
Why 2 | Flatness not ok |
Why 3 | Punch Pressure not applied on bracket total area |
Why 4 | |
Why 5 | |
Root Cause (Outflow) | Punch & die plate surface uneven |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Occurance | Punch & die plate surface uneven | D D Ingale | 16/10/2023 | Pending | |
Occurance | Punch & die plate surface uneven | D D Ingale | 16/10/2023 | Pending |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | Sampling inspection 5 nos every Bin before Dispatch |
Inspection Method | Other |
Other Inspection Method | Gap between bracket |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | 5 nos /Bin |
10. Evidance of Countermeasure
Occurance (Before) |
|
Occurance (After) |
|
Outflow (Before) |
|
Outflow (After) |
|
11. Horizontal Deployment
Horizontal Deployment Required | |
Applicable Machine / Model / Plant |
12. Document Review
Documents | |
Specify Other Document |
13. Effectiveness Of Action
Reviewed Quantity | |
Reason for submission |