QFR No - 8000849150
Defect Details
NC No. | 8000849150 |
NC Date | 19/10/2023 |
NC Submission Date | |
Part No. | 53BJF00102 |
Part Name | PISTON (Ø18) |
Supplier Name & Code | 100177-SPECIALITY SINTERED PRODUCTS P |
ETL Plant | 1143-ETL Suspension Halol, Vadodara |
Defect Details | DIMETER UNDERSIZE-OD UNDERSIZE FOUND UPTO 17.904MM |
1. Problem Description
Defect Description | Piston OD 17.923 ~ 17.943 mm Undersize found up to 17.904 mm |
Detection Stage | Receipt |
Problem Severity | Function |
NG Quantity | 5 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo | gh5t3exnukab30icfhh4ky1b.jpg |
Supplier Communication Details
Quality Head Email ID | ganesh.padwalkar@specialitysintered.com |
Plant Head/CEO Email ID | lalit.chaudhari@ssplpune.com |
MD Email ID | lalit.chaudhari@ssplpune.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
30600
|
9000
|
0
|
9000
|
20000
|
68600
|
Check Qty |
30600
|
9000
|
0
|
9000
|
20000
|
68600
|
NG Qty |
12600
|
0
|
0
|
0
|
0
|
12600
|
Scrap | 12600 |
Rework | 0 |
Under Deviation | 0 |
Containment Action |
---|
1) Warehouse :-For 20,000 no`s 100 % Checking Done By SSPL Representative , Transit :- NIl . 2) All FG material Hold and started 100 % OD inspection of parts By Ring Gauge started. |
3. Process Flow
Process Flow Description |
---|
1)Forming 2)Sintering ,3)Sizing, 3)Machining .5)Drilling.6)Pre dispatch Inspection .7)Packing & Dispatch. |
4. Process Details
Process / Operation | Sizing |
Outsource | No |
Machine / Cell | 45s1 |
Machine / Cell No. | 45S1 |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Man | Unskilled Operator | Skilled Operator At Sizing Operation Verified Found Ok | O |
Method | Incorrect Method Of Inspection | Verified Inspection Method As PerControl Plan Decided. Decided | O |
Tool | Incorrect Tool | Verified Sizing Die Bottom Side Chamfer Height Excess | X |
Material | Incorrect Raw Material | Verified Ok | O |
Machine | Wrong Machine Used For Sizing Operation . | Verified Found Ok Correct Machine Used . | O |
6. Inspection Method Analysis (Current)
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | 75 |
7. Root Cause Analysis (Occurance)
Why 1 | Piston OD 17.923 ~ 17.943 mm Undersized found up to 17.904 mm |
Why 2 | During The Sizing Process Part Getting Under Size |
Why 3 | Sizing Die Bottom Side Chamfer Height Excess. |
Why 4 | Die Bottom Side Chamfer Height Checkpoint Not Available In Tool Control Plan . |
Why 5 | |
Root Cause (Occurance) | Die Bottom Side Chamfer Height Checkpoint Not Available In Tool Control Plan . |
Root Cause Analysis (Outflow)
Why 1 | Piston OD 17.923 ~ 17.943 mm Undersized found up to 17.904 mm |
Why 2 | Defective part Pass from Final Inspection . |
Why 3 | Not Detected In Final Inspection. |
Why 4 | -Inspection Done As Per Sampling Plan . . |
Why 5 | |
Root Cause (Outflow) | -Inspection Done As Per Sampling Plan . . |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Outflow | On Job Training provided through Opl To inspectors . | Sunil Shejwal | 20/11/2023 | 20/10/2023 | Completed |
Outflow | 100 % Inspection Started Till Permanent Action Implementation | Sunil Shejwal | 20/11/2023 | 20/10/2023 | Completed |
Occurance | 1. Check Point Of Chamfer Height Checkpoint Added In Tool Control Plan . | Mr Mahesh Shinde | 25/10/2023 | 20/10/2023 | Completed |
Outflow | Quality Alert displayed at final inspection and Sizing section | Sunil Shejwal | 22/11/2023 | 20/10/2023 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | No |
Change Details | No Change |
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 100% |
10. Evidance of Countermeasure
Occurance (Before) |
Check Point Not Available In Tool Control Plan 585_Occurance_Before.pdf |
Occurance (After) |
Check Point Of Chamfer Height Checkpoint Added In Tool Control Plan . 585_Occurance_After.pdf |
Outflow (Before) |
Sampling Inspection At Final Inspection . 585_Outflow_Before.pdf |
Outflow (After) |
100 % Od Inspection Started Till Action Implementation . 585_Outflow_After.pdf |
11. Horizontal Deployment
Horizontal Deployment Required | No |
Applicable Machine / Model / Plant | NA |
12. Document Review
Documents | ControlPlan, InspCheckSheet |
Specify Other Document | Opl |
13. Effectiveness Of Action
Reviewed Quantity | 50 |
Reason for submission | ok |