QFR No - 8000849150
Defect Details
NC No. 8000849150
NC Date 19/10/2023
NC Submission Date
Part No. 53BJF00102
Part Name PISTON (Ø18)
Supplier Name & Code 100177-SPECIALITY SINTERED PRODUCTS P
ETL Plant 1143-ETL Suspension Halol, Vadodara
Defect Details DIMETER UNDERSIZE-OD UNDERSIZE FOUND UPTO 17.904MM
 
1. Problem Description
Defect Description Piston OD 17.923 ~ 17.943 mm Undersize found up to 17.904 mm
Detection Stage Receipt
Problem Severity Function
NG Quantity 5
Is Defect Repeatative? Yes
Defect Sketch / Photo gh5t3exnukab30icfhh4ky1b.jpg
Supplier Communication Details
Quality Head Email ID ganesh.padwalkar@specialitysintered.com
Plant Head/CEO Email ID lalit.chaudhari@ssplpune.com
MD Email ID lalit.chaudhari@ssplpune.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
30600
9000
0
9000
20000
68600
Check Qty
30600
9000
0
9000
20000
68600
NG Qty
12600
0
0
0
0
12600
 
Scrap 12600
Rework 0
Under Deviation 0
Containment Action
1) Warehouse :-For 20,000 no`s 100 % Checking Done By SSPL Representative , Transit :- NIl . 2) All FG material Hold and started 100 % OD inspection of parts By Ring Gauge started.
 
3. Process Flow
Process Flow Description
1)Forming 2)Sintering ,3)Sizing, 3)Machining .5)Drilling.6)Pre dispatch Inspection .7)Packing & Dispatch.
 
4. Process Details
Process / Operation Sizing
Outsource No
Machine / Cell 45s1
Machine / Cell No. 45S1
5. Problem Analysis
Type Possible Cause Fact Verification Jud
ManUnskilled OperatorSkilled Operator At Sizing Operation Verified Found OkO
MethodIncorrect Method Of InspectionVerified Inspection Method As PerControl Plan Decided. DecidedO
ToolIncorrect ToolVerified Sizing Die Bottom Side Chamfer Height ExcessX
MaterialIncorrect Raw MaterialVerified OkO
MachineWrong Machine Used For Sizing Operation .Verified Found Ok Correct Machine Used .O
 
6. Inspection Method Analysis (Current)
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 75
7. Root Cause Analysis (Occurance)
Why 1 Piston OD 17.923 ~ 17.943 mm Undersized found up to 17.904 mm
Why 2 During The Sizing Process Part Getting Under Size
Why 3 Sizing Die Bottom Side Chamfer Height Excess.
Why 4 Die Bottom Side Chamfer Height Checkpoint Not Available In Tool Control Plan .
Why 5
Root Cause (Occurance) Die Bottom Side Chamfer Height Checkpoint Not Available In Tool Control Plan .
 
Root Cause Analysis (Outflow)
Why 1 Piston OD 17.923 ~ 17.943 mm Undersized found up to 17.904 mm
Why 2 Defective part Pass from Final Inspection .
Why 3 Not Detected In Final Inspection.
Why 4 -Inspection Done As Per Sampling Plan . .
Why 5
Root Cause (Outflow) -Inspection Done As Per Sampling Plan . .
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OutflowOn Job Training provided through Opl To inspectors .Sunil Shejwal20/11/202320/10/2023Completed
Outflow100 % Inspection Started Till Permanent Action ImplementationSunil Shejwal20/11/202320/10/2023Completed
Occurance1. Check Point Of Chamfer Height Checkpoint Added In Tool Control Plan .Mr Mahesh Shinde25/10/202320/10/2023Completed
OutflowQuality Alert displayed at final inspection and Sizing sectionSunil Shejwal22/11/202320/10/2023Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System No
Change Details No Change
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
10. Evidance of Countermeasure
Occurance (Before) Check Point Not Available In Tool Control Plan
585_Occurance_Before.pdf
Occurance (After) Check Point Of Chamfer Height Checkpoint Added In Tool Control Plan .
585_Occurance_After.pdf
Outflow (Before) Sampling Inspection At Final Inspection .
585_Outflow_Before.pdf
Outflow (After) 100 % Od Inspection Started Till Action Implementation .
585_Outflow_After.pdf
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant NA
 
12. Document Review
Documents ControlPlan, InspCheckSheet
Specify Other Document Opl
 
13. Effectiveness Of Action
Reviewed Quantity 50
Reason for submission ok