QFR No - 8000855363
Defect Details
NC No. 8000855363
NC Date 18/12/2023
NC Submission Date
Part No. 520JT00302
Part Name PLATE CLUTCH 3W-4S UPGRADE
Supplier Name & Code 100150-DHANANJAY ENTERPRISES
ETL Plant 1132-ETL K-226/1 TRANSMISSION
Defect Details THICKNESS UNDERSIZE-THICKNESS U/S UP TO 1.63 AGAINST 2.0
 
1. Problem Description
Defect Description Wrong Thickness observed in 3W4S Plate clutch (1.6 mm observed in 2 mm)
Detection Stage Inprocess
Problem Severity Function
NG Quantity 17
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID qade@dhananjaygroup.com
Plant Head/CEO Email ID de@dhananjaygroup.com
MD Email ID kandakuretn@dhananjaygroup.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
19480
0
0
20160
0
39640
Check Qty
19480
0
0
20160
0
39640
NG Qty
22
0
0
52
0
74
 
Scrap 74
Rework 0
Under Deviation 0
Containment Action
Segregated whole lot at the M/s ETL end & our DE-I plant end.
 
3. Process Flow
Process Flow Description
Receiving inspection of RM?Blanking & Piercing?Deburring?Cleaning?Planishing?Straightening?Final Inspection?Oiling & Packing?Logistics/Dispatch
 
4. Process Details
Process / Operation Blanking & Piercing
Outsource No
Machine / Cell Press Machine-Pnumatic 100T
Machine / Cell No. Machine no.-10000063
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MethodSet-up approvalSet-up approval not followed after RM coil changeX
ManMan- Unskilled OperatorUnskilled operator for loading of coilX
ManMan- Wrong coil loadingWrong thickness coil loading on D-coilerX
MaterialMaterial- RM StorageNo separate storage location for same width different thickness coilsX
MaterialMaterial- Wrong thk.Wrong material thickness coil loaded on D-coilerX
MachineMachine- Excess deburringNo excess deburring done on partO
 
6. Inspection Method Analysis (Current)
Inspection Method Instrument
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 05nos/lot
7. Root Cause Analysis (Occurance)
Why 1 Wrong thickness in Plate Clutch 3W4S
Why 2 Required thickness 2 observed 1.6mm
Why 3 Two packed form RM coils have same width but different thickness.
Why 4 No separate storage location available.
Why 5
Root Cause (Occurance) No separate storage location available.
 
Root Cause Analysis (Outflow)
Why 1 Wrong thickness in Plate Clutch 3W4S
Why 2 Required thickness 2 observed 1.6mm
Why 3 Set up approval not done after RM Coil change.
Why 4 Set-up approval done during changeover of part/die only.
Why 5 RM coil loading approval report not considered in setting of new RM coil on D-Coiler in PFMEA
Root Cause (Outflow) RM coil loading approval report not considered in setting of new RM coil on D-Coiler in PFMEA
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceSeparate location provided for same width-different thickness raw material coilMr. Nikhil Attarde30/12/202330/12/2023Completed
OccuranceColour coding with blue & yellow paint colour according to thickness of same width different thickness RM coils to be ensured by incoming inspection person.Meantime the same to be informed to supplier for this colour codification.Mr. Nikhil Attarde30/12/202330/12/2023Completed
Outflow100% inspection of material for thickness with Gap gauge started for next 1 month.Mr. Nikhil Attarde30/12/202318/12/2023Completed
OutflowRaw material coil loading approval report provided for every new coil loading on D-coiler.Mr. Nikhil Attarde30/12/202330/12/2023Completed
OccuranceTraining given to operatorMr. Nikhil Attarde30/12/202320/12/2023Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Gap-Gauge inspection started 100% for thickness mix-up detection for next one month
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size 05nos/lot
10. Evidance of Countermeasure
Occurance (Before) RM coils of same width and different thickness have no separate location available for storage.
618_Occurance_Before.jpg
Occurance (After) RM coils of same width and different thickness have allocated separate location for storage.
618_Occurance_After.jpg
Outflow (Before) Set-up approval report take for die-change & start of the shift only.
618_Outflow_Before.pdf
Outflow (After) RM coil loading approval report for every new coil loading on machine D-coiler.
618_Outflow_After.pdf
 
11. Horizontal Deployment
Horizontal Deployment Required No
Applicable Machine / Model / Plant N.A
 
12. Document Review
Documents ControlPlan, PFMEA, InspCheckSheet
Specify Other Document N.A
 
13. Effectiveness Of Action
Reviewed Quantity 1000
Reason for submission OK