QFR No - 8000858053
Defect Details
NC No. | 8000858053 |
NC Date | 08/01/2024 |
NC Submission Date | |
Part No. | 550DZ03302 |
Part Name | FORK BOLT |
Supplier Name & Code | 100189-SANGKAJ STEEL PVT LTD. |
ETL Plant | 1117-ETL K-228/9 Suspension |
Defect Details | NOT AS PER SPECIFICATION-M10 THREAD LENGTH UNDERSIZE OBSERVED VAL |
1. Problem Description
Defect Description | M10 thread length undersize |
Detection Stage | Receipt |
Problem Severity | Fitment |
NG Quantity | 1360 |
Is Defect Repeatative? | No |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | qualityassurance@sangkaj.com |
Plant Head/CEO Email ID | steel@sangkaj.com |
MD Email ID | anirudh.2007@hotmail.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
0
|
0
|
0
|
1000
|
0
|
1000
|
Check Qty |
0
|
0
|
0
|
1000
|
0
|
1000
|
NG Qty |
0
|
0
|
0
|
7
|
0
|
7
|
Scrap | 0 |
Rework | 7 |
Under Deviation | 0 |
Containment Action |
---|
100 % sorting done at M/s Sangkaj steel end |
3. Process Flow
Process Flow Description |
---|
RM store - RM inspection - Traub - CNC 1st - CNC 2nd - Thread rolling -plating - Final inspection -Dispatch. |
4. Process Details
Process / Operation | Tapping Operation |
Outsource | No |
Machine / Cell | Tapping machine |
Machine / Cell No. | Tapping machine |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Machine | Coolant Flow is not Proper | Less Coolant flow on Tap | X |
6. Inspection Method Analysis (Current)
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | 05 Nos |
7. Root Cause Analysis (Occurance)
Why 1 | Thread Plug Gauge not Qualify in threading M10X1.25-6H |
Why 2 | Small Burr stuck in Threading & settled at the bottom thread after Plating. |
Why 3 | During tapping Small burr not get removed |
Why 4 | Less Coolant Flow on tap. |
Why 5 | |
Root Cause (Occurance) | Less Coolant Flow |
Root Cause Analysis (Outflow)
Why 1 | Thread Plug Gauge not Qualify in threading M10X1.25-6H |
Why 2 | Defective parts get Skipped from Inspection |
Why 3 | parts Checkied on Sampling Basis. |
Why 4 | Inadequate Inspection Method |
Why 5 | |
Root Cause (Outflow) | Inspection Method inadequate |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Occurance | Coolant Flow Increased during Tapping. Also Operator given training about not to do tapping if Coolant Flow is not Proper. | Mr. Pathan K.H. | 22/01/2024 | 22/01/2024 | Completed |
Outflow | Inspection done on Sampling Basis, But the Sample Size Increased. Previously only 05 Nos were Checked for thread during Final Inspection, now Sample Size increased to 30%. | Mr Mukta | 23/01/2024 | 23/01/2024 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | Inspection done on Sampling Basis, But the Sample Size Increased. Previously only 05 Nos were Checked for thread during Final Inspection, now Sample Size increased to 30%. |
Inspection Method | Gauge |
Other Inspection Method | |
Check Point at Final Inspection | Yes |
Checking Freq. | Sampling |
Sampling | No |
Sample Size | 30% |
10. Evidance of Countermeasure
Occurance (Before) |
coolant direction is wrong. 630_Occurance_Before.pdf |
Occurance (After) |
Correct the coolant direction & coolant is on tap. 630_Occurance_After.pdf |
Outflow (Before) |
Inadequate Inspection Method 630_Outflow_Before.pdf |
Outflow (After) |
Inspection done on Sampling Basis, But the Sample Size Increased. Previously only 05 Nos were Checked for thread during Final Inspection, now Sample Size increased to 30%. 630_Outflow_After.pdf |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | Applicable for all fork bolt. |
12. Document Review
Documents | ControlPlan, PFMEA, InspCheckSheet |
Specify Other Document | N/A |
13. Effectiveness Of Action
Reviewed Quantity | 184 |
Reason for submission | Verified and found ok |