QFR No - 8000865373
Defect Details
NC No. 8000865373
NC Date 02/03/2024
NC Submission Date
Part No. 3620140633
Part Name M/C CYL BLOCK D105D/D109A P125 FI BLK (P
Supplier Name & Code 100076-BALAJI ENGINEERING
ETL Plant 1102-ETL L-6 Die Casting
Defect Details CO-ORDINATE NOT OK-DOWEL TO DOWEL NOT OK
 
1. Problem Description
Defect Description Cylinder Block Pulsar FI - Dowel to Dowel co ordinate not ok
Detection Stage Inprocess
Problem Severity Fitment
NG Quantity 18
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID
Plant Head/CEO Email ID
MD Email ID
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
--
--
--
--
--
--
Check Qty
--
--
--
--
--
--
NG Qty
--
--
--
--
--
--
 
Scrap
Rework
Under Deviation
Containment Action
--
 
3. Process Flow
Process Flow Description
--
 
4. Process Details
Process / Operation
Outsource
Machine / Cell
Machine / Cell No.
5. Problem Analysis
-------
Type Possible Cause Fact Verification Jud
 
6. Inspection Method Analysis (Current)
Inspection Method
Other Inspection Method
Check Point at Final Inspection
Checking Freq.
Sampling
Sample Size
7. Root Cause Analysis (Occurance)
Why 1
Why 2
Why 3
Why 4
Why 5
Root Cause (Occurance)
 
Root Cause Analysis (Outflow)
Why 1
Why 2
Why 3
Why 4
Why 5
Root Cause (Outflow)
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
-------
Type Countermeasure Details Responsibility Target Date Actual Date Status
 
9. Inspection Method After Customer Complaint
Change In Inspection System
Change Details
Inspection Method
Other Inspection Method
Check Point at Final Inspection
Checking Freq.
Sampling
Sample Size
10. Evidance of Countermeasure
Occurance (Before)
Occurance (After)
Outflow (Before)
Outflow (After)
 
11. Horizontal Deployment
Horizontal Deployment Required
Applicable Machine / Model / Plant
 
12. Document Review
Documents
Specify Other Document
 
13. Effectiveness Of Action
Reviewed Quantity
Reason for submission