QFR No - 8000865629
Defect Details
NC No. | 8000865629 |
NC Date | 05/03/2024 |
NC Submission Date | |
Part No. | 530HQ00202 |
Part Name | ORIFICE VALVE |
Supplier Name & Code | 100141-ARVIND AUTOMOTIVE (INDIA) PVT. |
ETL Plant | 1126-ETL Pantnagar |
Defect Details | PLATING NOT OK-RUSTY |
1. Problem Description
Defect Description | Orifice Valves Observed Rusty (Internal Paper packing got teared as well Polythene Sealing observed partially) |
Detection Stage | Receipt |
Problem Severity | Function |
NG Quantity | 760 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | automotivearvind@yahoo.com |
Plant Head/CEO Email ID | automotivearvind@yahoo.com |
MD Email ID | cheemaarvind@yahoo.in |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
40000
|
20000
|
0
|
10000
|
0
|
70000
|
Check Qty |
40000
|
20000
|
0
|
10000
|
0
|
70000
|
NG Qty |
760
|
0
|
0
|
0
|
0
|
760
|
Scrap | 0 |
Rework | 760 |
Under Deviation | 0 |
Containment Action |
---|
100% SEGREGATION DONE AT ETL END |
3. Process Flow
Process Flow Description |
---|
DEBARRING |
4. Process Details
Process / Operation | BLANKING ,PUNCHING & DEBURRING |
Outsource | No |
Machine / Cell | CFM |
Machine / Cell No. | CFM-02 |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Man | Unskilled barrel operator | Skill materix verify ok | O |
Material | Raw material sandvic 20 c | MTC verify -ok | O |
Method | Packing material not good | Boxes damage | X |
Tool | Tool is ok | Tool History card verify ok | O |
Machine | Drayer time less | Auto cut switch not working | X |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | Visual |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | Each lot |
7. Root Cause Analysis (Occurance)
Why 1 | Rusty problem observed |
Why 2 | Rust observed during transporting |
Why 3 | Boxes condition is not good |
Why 4 | Poor packing quality |
Why 5 | Boxes not wrap with polythene strength |
Root Cause (Occurance) | Boxes not wrap with polythene |
Root Cause Analysis (Outflow)
Why 1 | Rusty material found at customer end |
Why 2 | Material not verify at logistics end |
Why 3 | AAIPL person not available at logistics |
Why 4 | |
Why 5 | |
Root Cause (Outflow) | No verification done at logistics end before supply to ETL end |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Occurance | After packing boxes wrap with polythene to keep strength | Bhanu | 02/01/2024 | Pending |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | daily stock details verify at logistics end |
Inspection Method | Other |
Other Inspection Method | Visual |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | EACH LOT |
10. Evidance of Countermeasure
Occurance (Before) |
|
Occurance (After) |
|
Outflow (Before) |
|
Outflow (After) |
|
11. Horizontal Deployment
Horizontal Deployment Required | |
Applicable Machine / Model / Plant |
12. Document Review
Documents | |
Specify Other Document |
13. Effectiveness Of Action
Reviewed Quantity | |
Reason for submission |