QFR No - 8000870484
Defect Details
NC No. 8000870484
NC Date 08/04/2024
NC Submission Date
Part No. B2FP04503O
Part Name HOLDER BRACKET BODY RAW- K2 REAR ABS
Supplier Name & Code 101180-MAULI CAST TECH PVT. LTD
ETL Plant 1120-ETL K-226/2 Disc Brakes
Defect Details BLOW HOLES-PIN HOLE, BLOW HOLE DENT &DAMAGED
 
1. Problem Description
Defect Description BLOW HOLES-PIN HOLE, BLOW HOLE DENT &DAMAGED
Detection Stage Inprocess
Problem Severity Aesthetic
NG Quantity 87
Is Defect Repeatative? No
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID quality@maulicasttech.com
Plant Head/CEO Email ID planthead@maulicasttech.com
MD Email ID shrikant.shelke@maulimetal.com
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
9301
0
0
835
3080
13216
Check Qty
9301
0
0
835
3080
13216
NG Qty
87
0
0
9
33
129
 
Scrap 6
Rework 36
Under Deviation 0
Containment Action
All castings are segregated at ETL end & in-house also. And defective parts are being reworked at M/s-Mauli Casttech.
 
3. Process Flow
Process Flow Description
1.Raw material receive-->2.Incoming Inspection-->3.Raw Ingot Melting-->4.N2 Degassing Process-->5.Liquid Metal Transfer-->6.GDC Production-->7.Gate/Raiser Cutting-->8.Buffing Process-->9.Fetlling Process-->10.Heat Treatment-->11.Shot Blasting-->12.Engraving/Marking-->13.Final Inspection-->14.Move to FG-->15.PDIR Inspection-->16.Packing & Dispatch.
 
4. Process Details
Process / Operation At Riser & gate cutting stage.
Outsource No
Machine / Cell N/A
Machine / Cell No. N/A
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MethodCoating mixing process not ok.Operator manually mixing the water & die coat.X
MethodMetal to metal contact,New manpower,Impurities in molten metalPoor material handling,Change of regular manpower,Dross in metalX
ManUnskilled manpowerNew operator deputed for operation.X
ToolImproper tool using for operationTool shape not good.X
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method 100% visual inspecti
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size Every lot
7. Root Cause Analysis (Occurance)
Why 1 Metal to metal contact in shop floor.
Why 2 Poor material handling.
Why 3 Bins are got damaged.
Why 4 Separate bins are not available.
Why 5 Plastic bin shortage for shop floor movement.
Root Cause (Occurance) During shop floor movement of casting dedicated bins are not available.
 
Root Cause Analysis (Outflow)
Why 1 No metal metal contact during operation.
Why 2 Proper handling of material.
Why 3 Do not use the damaged bins.
Why 4 Dedicated bins to be provided to operator.
Why 5
Root Cause (Outflow) For shop floor casting movement dedicated bins to be provided.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OccuranceProper dedicated bins to be provide at all operation stages.Mr.Somesh Rout14/08/202408/05/2024Completed
OutflowPart wise dedicated bins to be provide for all operations.Mr.Somesh Rout14/08/202408/05/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Q gate inspection has started at buffing & fettlling area.
Inspection Method Other
Other Inspection Method Visual Inspection
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size Every lot
10. Evidance of Countermeasure
Occurance (Before) Casting movement in non-standard bins at post operation stage.
738_Occurance_Before.jpeg
Occurance (After) Now standard bins are procure for post operation stage. for proper part handling.
738_Occurance_After.jpeg
Outflow (Before) Semi skilled operator are deputed at post operation stage.
738_Outflow_Before.jpeg
Outflow (After) Now operator OJT has given & deputed at post operation stage. And skill matrix has updated.
738_Outflow_After.jpeg
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant Applicable to all Holder bracket model.
 
12. Document Review
Documents PFMEA, WISOP, AuditCheckSheet, PackingStd, InspCheckSheet
Specify Other Document N/A
 
13. Effectiveness Of Action
Reviewed Quantity 50
Reason for submission found ok