QFR No - 8000873487
Defect Details
NC No. 8000873487
NC Date 06/05/2024
NC Submission Date
Part No. F2LG05302B
Part Name SEAT PIPE - ABWB ENDURO
Supplier Name & Code 100539-N P ENTERPRISES
ETL Plant 1117-ETL K-228/9 Suspension
Defect Details NOT AS PER SPECIFICATION-OD OVERSIZE
 
1. Problem Description
Defect Description OD OVERSIZE
Detection Stage Inprocess
Problem Severity Fitment
NG Quantity 5
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID quality@npcindustries.in
Plant Head/CEO Email ID anand@npcindustries.in
MD Email ID ajay@npcindustries.in
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
640
2200
0
0
0
2840
Check Qty
640
2200
0
0
0
2840
NG Qty
5
0
0
0
0
5
 
Scrap 0
Rework 5
Under Deviation 0
Containment Action
segregation done at ETL and NP End
 
3. Process Flow
Process Flow Description
Process Flow Description 1.0 Raw Material 2.0 Cutting 3.0 Drawing 4.0 Head Formation 5.0 Rough Grinding 6.0 Punching 7.0 CNC Head Turning 8.0 CNC Boring & Facing 9.0 Tapping 10.0 Chamfering 11.0 ID Deburring 12.0 Finish Grinding 13.0 Final Inspection 14.0 Cleaning 15.0 Oiling 16.0 Packing &Dispatch.
 
4. Process Details
Process / Operation Final Grinding
Outsource Yes
Machine / Cell Centerless grinding
Machine / Cell No. CG-05
5. Problem Analysis
Type Possible Cause Fact Verification Jud
Methodskipped during inspectionAfter verification we observed part was skippedX
ManInprocess quality inspector negligentAfter verification found OKO
MaterialDressing not done as per define freq.After verification we found dressing done as per define feq.O
ManInprocess operator negligentafter verification found okO
MethodSetting Part MixedAfter verification found no chance of mixing of setting partO
MethodOperation skippedAfter verification we found operation was skippedX
 
6. Inspection Method Analysis (Current)
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size as per std
7. Root Cause Analysis (Occurance)
Why 1 The outer diameter is larger than the specified tolerance.
Why 2 Grinding operation is uneven
Why 3 Part could not be fully ground
Why 4 Operator skipped Grinding from Tail side
Why 5 Due to length being more operator performed 2operations simultaneously on one part (One from head side and then from tail side)
Root Cause (Occurance) Due to length being more operator performed 2operations simultaneously on one part (One from head side and then from tail side)
 
Root Cause Analysis (Outflow)
Why 1 Outer Diameter over size
Why 2 Part could not detected at final inspection
Why 3 skipped in Sampling at Final Inspection
Why 4 Sampling qty was less
Why 5
Root Cause (Outflow) Sampling qty was less
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OutflowSampling qty doubled during final inspection.Mr. Vinay08/05/202407/05/2024Completed
OccuranceFinal grinding work instruction to be updatedMr. Princ09/05/202409/05/2024Completed
Occuranceonly one side operation is performed at a time, and the next operation begins once the first operation is completed during final grindingMr. Ankush09/05/202409/05/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Sampling qty doubled
Inspection Method Gauge
Other Inspection Method
Check Point at Final Inspection Yes
Checking Freq. Sampling
Sampling No
Sample Size updated
10. Evidance of Countermeasure
Occurance (Before) Grind Both (tail & Head) Sides of a part simultaneously
780_Occurance_Before.jpg
Occurance (After) only one side operation (Head side) is performed at a time, and the next operation (tail side) begins once the first operation is completed during final grinding.
780_Occurance_After.jpg
Outflow (Before) Follow the sampling inspection method as per plan so sampling quantity was less
780_Outflow_Before.png
Outflow (After) Sampling Qty to be doubled.
780_Outflow_After.png
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant All similar model
 
12. Document Review
Documents ControlPlan, PFMEA, WISOP, JHCheckSheet, InspCheckSheet
Specify Other Document No
 
13. Effectiveness Of Action
Reviewed Quantity 100
Reason for submission OK