QFR No - 8000873536
Defect Details
NC No. 8000873536
NC Date 06/05/2024
NC Submission Date
Part No. F2DZ07203B
Part Name FORK BOLT (K-9207) Ni+Cr Plated
Supplier Name & Code 100539-N P ENTERPRISES
ETL Plant 1117-ETL K-228/9 Suspension
Defect Details NOT AS PER SPECIFICATION-PLATING MISSING
 
1. Problem Description
Defect Description PLATING MISSING
Detection Stage Inprocess
Problem Severity Aesthetic
NG Quantity 2
Is Defect Repeatative? Yes
Defect Sketch / Photo
Supplier Communication Details
Quality Head Email ID quality@npcindustries.in
Plant Head/CEO Email ID anand@npcindustries.in
MD Email ID ajay@npcindustries.in
2. Stock Details & action taken for NG parts
Location ETL End Warehouse Transit Supplier FG Supplier WIP Total
Total Qty
1500
50000
0
0
0
51500
Check Qty
1500
50000
0
0
0
51500
NG Qty
2
0
0
0
0
2
 
Scrap 2
Rework 0
Under Deviation 0
Containment Action
1.Raw Material 2. Blanking 3. Hex Punching 4. Flattening 5. CNC Turning, Chamfering & threading 6. Buffing 7. Plating 8.Final Inspection.
 
3. Process Flow
Process Flow Description
10 - Raw Material 20 - Cutting and Forging(1st) 30-Forging(2nd) 40-Annealing 50-Phosphating 60 - Forging(3rd) I.D 70-Forging(4th) Hex 80 - CNC(1st) 90 - CNC(2nd) 100 - CNC(3rd) 110 - CNC drilling and Chamfering 120 - Final inspection 130 - Packing & Dispatch 140 - Buffing-1st 150 - Buffing 2nd 160 - Plating
 
4. Process Details
Process / Operation Plating
Outsource Yes
Machine / Cell Plating plant
Machine / Cell No. NA
5. Problem Analysis
Type Possible Cause Fact Verification Jud
MaterialPlating chemicals composition was not as per spec.After verification we found OKO
ManUntrained OperatorAfter verification we found operator was aware about process and responsibilitiesO
MethodPlating time duration lessAfter verification we observed plating time duration as per std.O
MethodPC position holding method NGDuring verification we found Jig holder was damageX
MethodSkipped during final inspectionafter verification we found part was skipped at final inspection.X
 
6. Inspection Method Analysis (Current)
Inspection Method Other
Other Inspection Method visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
7. Root Cause Analysis (Occurance)
Why 1 The bolt was not correctly positioned during the plating process.
Why 2 The jig point, which is supposed to hold the bolt securely, was not clean.
Why 3 The jig cleaning process was either inadequate or not performed regularly.
Why 4 There was no clear protocol or schedule for cleaning the jig points.
Why 5 WI did not include guidelines for the regular cleaning of jig points.
Root Cause (Occurance) WI did not include guidelines for the regular cleaning of jig points.
 
Root Cause Analysis (Outflow)
Why 1 Plating NG in fork bolt.
Why 2 Defected part could not detect
Why 3 The part was skipped at final Q-gate.
Why 4 NG and OK pc was put at the same color of bin.
Why 5
Root Cause (Outflow) NG and OK pc was put at the same color of bin.
 
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type Countermeasure Details Responsibility Target Date Actual Date Status
OutflowLocked red bin implement at the Final Q gateNikhil Jain11/05/202411/05/2024Completed
OutflowQ-alert to be displayed at final Q gateMr. Deepak08/05/202407/05/2024Completed
OccuranceRegular cleaning of jig points to be added in WINikhil Jain10/05/202409/05/2024Completed
OutflowBlue bin used for without checked material and Green bin used for Checked material.Nikhil Jain15/05/202411/05/2024Completed
 
9. Inspection Method After Customer Complaint
Change In Inspection System Yes
Change Details Same color of bin to be replaced with different color for different purpose.
Inspection Method Other
Other Inspection Method Visual
Check Point at Final Inspection Yes
Checking Freq. 100%
Sampling No
Sample Size 100%
10. Evidance of Countermeasure
Occurance (Before) WI did not include guidelines for the regular cleaning of jig points.
788_Occurance_Before.jpg
Occurance (After) updated wi to be updated
788_Occurance_After.jpg
Outflow (Before) NG and OK pc was put at the same color of bin.
788_Outflow_Before.jpeg
Outflow (After) NG pcs put in orange bin and OK pc was put in Blue bin and red bin implement
788_Outflow_After.pdf
 
11. Horizontal Deployment
Horizontal Deployment Required Yes
Applicable Machine / Model / Plant All Similar parts
 
12. Document Review
Documents PMCheckSheet, PFMEA, WISOP
Specify Other Document Na
 
13. Effectiveness Of Action
Reviewed Quantity 50
Reason for submission ok