Defect Details
NC No. | 8000874507 |
NC Date | 16/05/2024 |
NC Submission Date | |
Part No. | F2LG07102B |
Part Name | SEAT PIPE - J1D |
Supplier Name & Code | 100539-N P ENTERPRISES |
ETL Plant | 1117-ETL K-228/9 Suspension |
Defect Details | NOT AS PER SPECIFICATION-CRACK - MATERIAL DEFECT |
1. Problem Description
Defect Description | CRACK - MATERIAL DEFECT |
Detection Stage | Receipt |
Problem Severity | Safety |
NG Quantity | 1 |
Is Defect Repeatative? | No |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | quality@npcindustries.in |
Plant Head/CEO Email ID | anand@npcindustries.in |
MD Email ID | ajay@npcindustries.in |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
960
|
20000
|
0
|
0
|
0
|
20960
|
Check Qty |
960
|
20000
|
0
|
0
|
0
|
20960
|
NG Qty |
1
|
0
|
0
|
0
|
0
|
1
|
Scrap | 1 |
Rework | 0 |
Under Deviation | 0 |
Containment Action |
---|
Segregated all material at the customer end and NP end. |
3. Process Flow
Process Flow Description |
---|
Process Flow Description 1.0 Raw Material 2.0 Cutting 3.0 Drawing 4.0 Head Formation 5.0 Rough Grinding 6.0 Punching 7.0 CNC Head Turning 8.0 CNC Boring & Facing 9.0 Tapping 10.0 Chamfering 11.0 ID Deburring 12.0 Finish Grinding 13.0 Final Inspection 14.0 Cleaning 15.0 Oiling 16.0 Packing &Dispatch. |
4. Process Details
Process / Operation | Raw material |
Outsource | Yes |
Machine / Cell | -- |
Machine / Cell No. | -- |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|---|---|---|
Method | setting part mixed with ok material | During verification we found possibility of setting part mixing | X |
Method | part was skipped at final Q gate (NPC) | Part was skipped during visual inspection | X |
Material | Designated Grade not use | Material Observed as per specification | O |
Method | Process Parameters NG | After verification we found OK | O |
Method | Preventive Maintenance | Preventive maintenance carried out at defined interval | O |
Man | Un skilled Operator | Checked & Observed that skilled operator was running the line. | O |
6. Inspection Method Analysis (Current)
Inspection Method | Other |
Other Inspection Method | Visual |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 100% |
7. Root Cause Analysis (Occurance)
Why 1 | one pc head crack found at customer end |
Why 2 | NG crack setting parts got mixed with ok material |
Why 3 | NG part kept in open bin |
Why 4 | Locked bin not available at Draw |
Why 5 | |
Root Cause (Occurance) | Locked bin not available at Draw |
Root Cause Analysis (Outflow)
Why 1 | Part was skipped at final inspection. |
Why 2 | Crack was not visible during inspection. |
Why 3 | Crack might be microscopic and not detectable by naked eye. |
Why 4 | Inspector may have lacked sufficient training to detect micro-cracks. |
Why 5 | |
Root Cause (Outflow) | The inspector may have lacked sufficient training to detect micro-cracks. |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|---|---|---|---|---|
Outflow | Q -Alert to be displayed at the final Q-gate | Mr. Princ | 17/05/2024 | 16/05/2024 | Completed |
Outflow | Micro crack detection regarding training to be given to NPC final inspection inspectors. | Mr. Gurpreet singh | 20/05/2024 | 17/05/2024 | Completed |
Occurance | Open red bin to be replaced with locked red bin in forging area | Mr. Narinder | 20/05/2024 | 18/05/2024 | Completed |
Occurance | Training to be given to all setters and operators for setting process regarding. | Mr. Kulwant | 21/05/2024 | 18/05/2024 | Completed |
9. Inspection Method After Customer Complaint
Change In Inspection System | Yes |
Change Details | 100% Visual Inspection |
Inspection Method | Other |
Other Inspection Method | Visual & testing met |
Check Point at Final Inspection | Yes |
Checking Freq. | 100% |
Sampling | No |
Sample Size | 100% |
10. Evidance of Countermeasure
Occurance (Before) |
Open Red bin used 810_Occurance_Before.jpeg |
Occurance (After) |
Open red bin to be replaced with locked red bin in forging area 810_Occurance_After.jpeg |
Outflow (Before) |
N/A 810_Outflow_Before.png |
Outflow (After) |
Micro crack detection regarding training to be given to NPC final inspection inspectors. & Q -Alert to be displayed at the final Q-gate 810_Outflow_After.png |
11. Horizontal Deployment
Horizontal Deployment Required | Yes |
Applicable Machine / Model / Plant | All similar model |
12. Document Review
Documents | PFMEA, WISOP |
Specify Other Document | NA |
13. Effectiveness Of Action
Reviewed Quantity | 100 |
Reason for submission | ok |