QFR No - 8000876968
Defect Details
NC No. | 8000876968 |
NC Date | 05/06/2024 |
NC Submission Date | |
Part No. | F2FA25633M |
Part Name | FORK PIPE MACHINED (26.1*21*264) |
Supplier Name & Code | 101030-TUBE INVESTMENTS OF INDIA LTD |
ETL Plant | 1117-ETL K-228/9 Suspension |
Defect Details | NOT AS PER SPECIFICATION-ID UNDER SIZE & RUN OUT OBSERVED 0.4 |
1. Problem Description
Defect Description | ID UNDER SIZE & RUN OUT OBSERVED 0.4 |
Detection Stage | Inprocess |
Problem Severity | Fitment |
NG Quantity | 239 |
Is Defect Repeatative? | Yes |
Defect Sketch / Photo |
Supplier Communication Details
Quality Head Email ID | AmitVD@tii.murugappa.com |
Plant Head/CEO Email ID | guptaajay@tii.murugappa.com |
MD Email ID | mukeshahuja@tii.murugappa.com |
2. Stock Details & action taken for NG parts
Location | ETL End | Warehouse | Transit | Supplier FG | Supplier WIP | Total |
---|---|---|---|---|---|---|
Total Qty |
500
|
0
|
0
|
0
|
0
|
500
|
Check Qty |
500
|
0
|
0
|
0
|
0
|
500
|
NG Qty |
239
|
0
|
0
|
0
|
0
|
239
|
Scrap | 239 |
Rework | 0 |
Under Deviation | 0 |
Containment Action |
---|
All Stock is available at ETL end & in-house checked for the Machining Rut out at ID Spec. 0.05 MM Max. |
3. Process Flow
Process Flow Description |
---|
Raw Material Inspection- Machining (Cualking & Threading)-Drilling-Oiling-Final Inspection-Dispatch |
4. Process Details
Process / Operation | Machining |
Outsource | No |
Machine / Cell | Machine Cell |
Machine / Cell No. | M/c No. 18 |
5. Problem Analysis
Type | Possible Cause | Fact Verification | Jud |
---|
6. Inspection Method Analysis (Current)
Inspection Method | |
Other Inspection Method | |
Check Point at Final Inspection | |
Checking Freq. | |
Sampling | |
Sample Size |
7. Root Cause Analysis (Occurance)
Why 1 | |
Why 2 | |
Why 3 | |
Why 4 | |
Why 5 | |
Root Cause (Occurance) |
Root Cause Analysis (Outflow)
Why 1 | |
Why 2 | |
Why 3 | |
Why 4 | |
Why 5 | |
Root Cause (Outflow) |
8. Countermeasure ( Occurrence , Outflow & System side Actions )
Type | Countermeasure Details | Responsibility | Target Date | Actual Date | Status |
---|
9. Inspection Method After Customer Complaint
Change In Inspection System | |
Change Details | |
Inspection Method | |
Other Inspection Method | |
Check Point at Final Inspection | |
Checking Freq. | |
Sampling | |
Sample Size |
10. Evidance of Countermeasure
Occurance (Before) |
|
Occurance (After) |
|
Outflow (Before) |
|
Outflow (After) |
|
11. Horizontal Deployment
Horizontal Deployment Required | |
Applicable Machine / Model / Plant |
12. Document Review
Documents | |
Specify Other Document |
13. Effectiveness Of Action
Reviewed Quantity | |
Reason for submission |